For collection and delivery jobs: Jobs will be ordered by the CALIDUS ePOD device in Site/Load/Planned Start Date and Time order by default.

However, if sequences are passed through on jobs, these are used in preference i.e. Site/Load/Sequence/Planned Start Date and Time.

The following rules apply:

  • Jobs with sequence 0, blank or non-numeric values are seen as un-sequenced jobs and will always appear in the list after sequenced jobs.
  • If re-sequence checks are turned on in C-ePOD, only jobs with a sequence (i.e. not null or 0) are checked. So, if a load consists of the following jobs:
    • Job 1, no sequence, time 1200
    • Job 2, sequence 2, time 1100
    • Job 3, sequence 1, time 0900
    • Job 4, no sequence, time 1200
    • Job 5, sequence 3, time 1200
    • Job 6, sequence 3, time 0900
    • Job 7, no sequence, time 0900
  • They will be ordered on the list as follows:
    • Job 3, sequence 1, time 0900
    • Job 2, sequence 2, time 1100
    • Job 6, sequence 3, time 0900
    • Job 5, sequence 3, time 1200
    • Job 7, no sequence, time 0900
    • Job 1, no sequence, time 1200
    • Job 4, no sequence, time 1200
  • When the user attempts to start a job out of sequence, and re-sequence checks are enabled, this will work as follows:
    • Jobs 2, 5 and 6 cannot be completed before job 3.
    • Jobs 5 and 6 cannot be completed before job 2.
    • When jobs 2 and 3 are complete, Jobs 5 and 6 may be completed in any order.
    • Jobs 1, 4 and 7 are "wild cards", and may be completed at any time, before or after any other job is completed.