Template:REQ SCR Line: Difference between revisions
From MCS
No edit summary |
(No difference)
|
Revision as of 10:32, 2 March 2015
Note: To be used with Template:REQ_SCR_Header and Template:REQ_SCR_Footer only.
Usage:
{{REQ_SCR_Line
|SCR=The SCR number
|System=System affected
|Area=The area affected
|Description=Description of change
|Estimate=Cost or Days
|Notes=Notes cross-references
|Days=Estimate in Days? (Parameter Omitted-Adds £, Y-removes £, N-replaces with NA)
}}
Note: Typically, Days for estimate require EST, FS, ST, IMP and DEV. To apply a simple modifier (e.g. 70%) use the following notation in the estimate parameter:
{{#expr: myest*1.7 }}where myest is the number of days.
| {{{SCR}}} | 0.00 |