TRIP OVERVIEW: Difference between revisions

From CTMS
Line 34: Line 34:




See [[Trip Overview]] for more details
See [[Trip Overview (WaterFall)]] for more details


== Recent Changes ==
== Recent Changes ==

Revision as of 17:11, 11 May 2009

Features

  • Completely new screen
  • Designed to facilitate the Operational Process, after Planning, through to De-Brief and POD confirmation
  • Links to all operational controls from a single screen
  • Auto Refreshed Real-time overview visibility, for all users of a full scheduled transport day.

Benefits

  • Easier single point addition and control of resource to Planned Trips
  • Links to all operational controls from a single screen
  • More user-friendly means of capturing required operational data

Advantages

  • Auto Refreshed Real-time overview visibility, for all users of a full scheduled transport day.
  • Opportunity to capture all operational data from every Trip
  • Increased value of KPI Data
  • Reduced involvement time

User Control

  • Progressive updating of Trip Status is the key to the Waterfall process
  • Status ‘Blocks’ and visible fields can be configured for personal preference
  • Multiple user inputs visible through a single screen
  • Selectable Schedule Date or Date Range for analysis
  • ‘Find’ facility for Driver, Tractor and Trailer.
  • Search by Trip ID
  • Multi-Site visibility for authorised users


Tov 1.jpg


See Trip Overview (WaterFall) for more details

Recent Changes