|
|
(7 intermediate revisions by the same user not shown) |
Line 1: |
Line 1: |
| === Features ===
| | #redirect:[[Trip Overview (Waterfall)]] |
| | |
| *Completely new screen
| |
| *Designed to facilitate the Operational Process, after Planning, through to De-Brief and POD confirmation
| |
| *Links to all operational controls from a single screen
| |
| *Auto Refreshed Real-time overview visibility, for all users of a full scheduled transport day.
| |
| | |
| === Benefits ===
| |
| | |
| *Easier single point addition and control of resource to Planned Trips
| |
| *Links to all operational controls from a single screen
| |
| *More user-friendly means of capturing required operational data
| |
| | |
| === Advantages ===
| |
| | |
| *Auto Refreshed Real-time overview visibility, for all users of a full scheduled transport day.
| |
| *Opportunity to capture all operational data from every Trip
| |
| *Increased value of KPI Data
| |
| *Reduced involvement time
| |