TRIP OVERVIEW: Difference between revisions
From CTMS
Line 35: | Line 35: | ||
== Recent Changes == | == Recent Changes == | ||
*'''[[242102|242102 (PA-72FJ2B)Upgrades to Waterfall Screen]] ''' | *'''[[242102|242102 (PA-72FJ2B) Upgrades to Waterfall Screen]] ''' | ||
*'''[[254565|254565 (PA-7JARJ4)FIND button in the Trip Overview]] ''' | *'''[[254565|254565 (PA-7JARJ4) FIND button in the Trip Overview]] ''' |
Revision as of 15:40, 22 January 2009
Features
- Completely new screen
- Designed to facilitate the Operational Process, after Planning, through to De-Brief and POD confirmation
- Links to all operational controls from a single screen
- Auto Refreshed Real-time overview visibility, for all users of a full scheduled transport day.
Benefits
- Easier single point addition and control of resource to Planned Trips
- Links to all operational controls from a single screen
- More user-friendly means of capturing required operational data
Advantages
- Auto Refreshed Real-time overview visibility, for all users of a full scheduled transport day.
- Opportunity to capture all operational data from every Trip
- Increased value of KPI Data
- Reduced involvement time
User Control
- Progressive updating of Trip Status is the key to the Waterfall process
- Status ‘Blocks’ and visible fields can be configured for personal preference
- Multiple user inputs visible through a single screen
- Selectable Schedule Date or Date Range for analysis
- ‘Find’ facility for Driver, Tractor and Trailer.
- Search by Trip ID
- Multi-Site visibility for authorised users
