ER CTMS 045-059: Difference between revisions
From Calidus HUB
No edit summary |
m (Text replacement - "[[Category:{{#var:System}} ER]]↵" to "[[Category:{{#var:System}} ER]]Category:ER CTMS 045") |
||
Line 52: | Line 52: | ||
<noinclude> | <noinclude> | ||
[[Category:{{#var:System}} ER]] | [[Category:{{#var:System}} ER]][[Category:ER CTMS 045]]</noinclude> | ||
</noinclude> |
Latest revision as of 09:51, 14 July 2025
EMERGENCY RELEASE - CTMS 12.0
RELNOTE ER045-059
Module | Program Name | Ver | Call/Iss | Client Ref | Pr'ty | Remarks |
---|---|---|---|---|---|---|
DATA_ADM_SYSTEM_PARAM_02910494.sql | Database Script | 1.1 | 02910494 | - | 3 | A new system parameter called 'PAR_DUN_TRUNK_OFFSET_DAYS' is available to store the number of days for which trunk trips will be assessed for the radial trips that are created by Paragon.
A default value of 4 days will be used but the number of days will be configurable to assess the non-working days for the depot. This system parameter can be used to account for the non-working days during the period of the holiday seasons. The system parameter 'PAR_DUN_TRUNK_CUTOFF_TIME' will start to assess the current date prior to the cutoff time, or from tomorrow after the cutoff time. |
PAR.sql | Paragon Package | 5.116 | " | " | " | " |
New Parameters | |||
---|---|---|---|
Parameter Name | Config Level | Setting Value | Result |
PAR_DUN_TRUNK_OFFSET_DAYS | SYSTEM | NUMERIC | The specified number of days will be used to assess the trunk trips for the radial trips to account for the non-working days in the calendar. |
PAR_DUN_TRUNK_OFFSET_DAYS | SYSTEM | NULL/NON-NUMERIC | A default number of 4 days will be used as per the current functionality. |