Template:TMS PATCH: Difference between revisions

From Calidus HUB
(Created page with "<div class="noprint"> {{#vardefine:Client|The Supimix Client Ref, or OBS}} {{#vardefine:ClientName|The Supimix Client Name, or OBS Logistics Ltd}} {{#vardefine:System|''CALIDUS''...")
 
(v2.0 - Same for all)
Line 1: Line 1:
<div class="noprint">
<div class="noprint">
{{#vardefine:Client|The Supimix Client Ref, or OBS}}
{{#vardefine:Client|OBS}}
{{#vardefine:ClientName|The Supimix Client Name, or OBS Logistics Ltd}}
{{#vardefine:ClientName|OBS Logistics Ltd}}
{{#vardefine:System|''CALIDUS'' TMS}}
{{#vardefine:System|''CALIDUS'' WMS}}
{{#vardefine:Doc_Title|Release Notes}}
{{#vardefine:Doc_Title|Release Notes}}
{{#vardefine:Version|1.0}}
{{#vardefine:Version|1.0}}
{{#vardefine:Date|8th May 2012}}
{{#vardefine:Date|8th May 2016}}
{{#vardefine:Reference|The patch reference without the preceding P, e.g. 091}}
{{#vardefine:Reference|Patch without the P e.g. 091}}
{{#vardefine:Year|Copyright Year}}
{{#vardefine:Year|2016}}
</div>
</div>
{{Doc_Title
{{Doc_Title
Line 19: Line 19:
}}
}}
<!-- TOC -->  
<!-- TOC -->  
<!-- MEDIA LANDSCAPE YES -->
<div class="noprint">
<div class="noprint">


= Development Defects =
= SUMMARY INTRODUCTION =
{| border="1"  width="100%"
== INTRODUCTION ==
The main aim of this document is to provide {{#var:System}} users with the level of detail required to accurately test all software included in the patch.  The document also contains set-up and configuration details to enable the user to configure the system correctly for the new functionality to work.
 
 
=== GLOSSARY OF TERMS ===
 
{| border="1"
|- bgcolor="silver"
|- bgcolor="silver"
!colspan="8"|&nbsp; !! colspan="5"|Changes Required
!Term !! Meaning
|- bgcolor="silver"
|-
!Log Number !!Client Ref !!Log Priority !!Issue Raised and Test Objective !!Project/Site !!Functional Area !! Reported !! ER Number !! WCS !! EPOD !! TTM !! EDI !! MCS
|C-TMS || Transport Management System
|-
|C-WMS || Warehouse Management System
|-
|CR || Change Request
|-
|C-WCS || Warehouse Control System
|-
|C-ePOD || Electronic Proof of Delivery
|-
|C-MCS || Mobile Control System
|-
|C-TTM || Track and Trace Management
|-
|EDI || Electronic Data Interchange
|-
|-
|The Supimix Log Number ||The Supimix Client Reference ||The Supimix Priority ||Description of problem and solution ||Site ||Functional Area. If blank, inserted as 'u/a' ||Reported of issue ||ER Number on which this fix was released ||N ||N ||N ||N ||N
|TID || Testing Issue Development, or Log
|}
|}




<!-- MEDIA LANDSCAPE NO -->  
<!-- NEW PAGE -->  
= Modules Delivered =
== TESTING PROCESS ==
<table border="1px" width="100%">
 
<tr>
===TIDs AND RESOLUTION===
<td bgcolor="silver"><font size="2">'''Module Name'''</font></td>
If there are any areas of the functionality that are not acceptable or do not meet the requirement specified in the Change Request then these should be expressed by raising a TID.
<td bgcolor="silver"><font size="2">'''Version No'''</font></td>
 
<td bgcolor="silver"><font size="2">'''Description'''</font></td>
 
<td bgcolor="silver"><font size="2">'''Log Number'''</font></td>
=== FINAL 'END TO END' TESTING ===
</tr>
Prior to release to a production database, a full 'End to End' test is required on the test system by all sites using the database. Once this is signed off, a release date can be arranged.
{{PATCHModDeliveredTableRow
 
|ModuleName=Package Name
 
|VersionNo=Package Version
=== AUTHORISATION ===
|Description=Package Description
Authorisation from nominated release personnel only will be required when requesting a release to a production environment
|LogNumber=The Supimix Log Number
 
}}
 
{{PATCHModDeliveredTableRow
= CHANGE REQUESTS =
|Package Name
<!--
|Package Version
== CR REF:  ==
|Package Description
=== Reporter ===
|The Supimix Log Number
 
}}
=== OBS Log Number ===
</table>
 
=== Summary of request ===
 
=== Release notes ===
 
=== Set-up and configuration ===
-->
== CR REF:  ==
=== Reporter ===
 
=== OBS Log Number ===
 
=== Summary of request ===


=== Release notes ===


=== Set-up and configuration ===
<!-- NEW PAGE -->  
<!-- NEW PAGE -->  
= New Parameters =
== CR REF:  ==
=== Reporter ===
 
=== OBS Log Number ===
 
=== Summary of request ===
 
=== Release notes ===
 
=== Set-up and configuration ===
 
 
 
= SUPPORT INCIDENTS =
<!--
== Customer Ref:  ==
=== OBS Log Number ===
=== Reporter ===
=== Summary of Call ===
=== Detail of Fix ===
=== Set-up and configuration ===
-->
== Customer Ref:  ==
=== OBS Log Number ===
=== Reporter ===
=== Summary of Call ===
=== Detail of Fix ===
=== Set-up and configuration ===
 
 
= TID CHANGES =
<!--
== OBS Log Number: 331329 ==
=== Reporter ===
=== Summary of Call ===
=== Detail of Fix ===
=== Set-up and configuration ===
-->
== OBS Log Number: 331329 ==
=== Reporter ===
=== Summary of Call ===
=== Detail of Fix ===
=== Set-up and configuration ===
 
 
 
= OBSL PRODUCT DEVELOPMENT =
<!--
== OBS Log Number:  ==
=== Reporter ===
=== Summary of Call ===
=== Detail of Fix ===
=== Set-up and configuration ===
-->
== OBS Log Number:  ==
=== Reporter ===
=== Summary of Call ===
=== Detail of Fix ===
=== Set-up and configuration ===
 
 
 
= ADDITIONAL CHANGES =
== WCS ==
 
A WCS change is required for the following logs:
* Log
OR
 
There are no WCS changes required.
 
== EPOD/T2A ==
 
An ePOD/T2A change is required for the following logs:
* Log
OR
 
There are no ePOD/T2A changes required.
 
== MCS ==
 
An MCS change is required for the following logs:
* Log
OR
 
There are no MCS changes required.
 
== PORTAL/TTM ==


{| border="1"  width="100%"
A Portal change is required for the following logs:
|- bgcolor="silver"
* Log
!Log Number !!Path &amp; Name !!Config Level !!Setting Value !!Result
OR
|-
 
|The Supimix Log Number. ||The Path and Name of the Parameter Setting. ||The setting Level || The setting value.  ||The expected result of setting the Registry Setting as the Value specified
There are no Portal changes required.
|}


== EDI ==


<!-- NEW PAGE -->
An EDI change is required for the following logs:
= New Access =
* Log
OR


{| border="1"  width="100%"
There are no EDI changes required.
|- bgcolor="silver"
!Log Number !!Access Tab !!Name !!Description
|-
|The Supimix Log Number. ||The Access Tab.  ||The name || The description
|}




</div>
</div>
[[Category:{{#var:Client}} PATCH]]
[[Category:{{#var:Client}} PATCH]]

Revision as of 16:28, 14 June 2016





Aptean Logo.png







OBS Logistics Ltd

Release Notes


CALIDUS WMS

8th May 2016 - 1.0
Reference: PPatch without the P e.g. 091












































SUMMARY INTRODUCTION

INTRODUCTION

The main aim of this document is to provide CALIDUS WMS users with the level of detail required to accurately test all software included in the patch. The document also contains set-up and configuration details to enable the user to configure the system correctly for the new functionality to work.


GLOSSARY OF TERMS

Term Meaning
C-TMS Transport Management System
C-WMS Warehouse Management System
CR Change Request
C-WCS Warehouse Control System
C-ePOD Electronic Proof of Delivery
C-MCS Mobile Control System
C-TTM Track and Trace Management
EDI Electronic Data Interchange
TID Testing Issue Development, or Log


TESTING PROCESS

TIDs AND RESOLUTION

If there are any areas of the functionality that are not acceptable or do not meet the requirement specified in the Change Request then these should be expressed by raising a TID.


FINAL 'END TO END' TESTING

Prior to release to a production database, a full 'End to End' test is required on the test system by all sites using the database. Once this is signed off, a release date can be arranged.


AUTHORISATION

Authorisation from nominated release personnel only will be required when requesting a release to a production environment


CHANGE REQUESTS

CR REF:

Reporter

OBS Log Number

Summary of request

Release notes

Set-up and configuration

CR REF:

Reporter

OBS Log Number

Summary of request

Release notes

Set-up and configuration

SUPPORT INCIDENTS

Customer Ref:

OBS Log Number

Reporter

Summary of Call

Detail of Fix

Set-up and configuration

TID CHANGES

OBS Log Number: 331329

Reporter

Summary of Call

Detail of Fix

Set-up and configuration

OBSL PRODUCT DEVELOPMENT

OBS Log Number:

Reporter

Summary of Call

Detail of Fix

Set-up and configuration

ADDITIONAL CHANGES

WCS

A WCS change is required for the following logs:

  • Log

OR

There are no WCS changes required.

EPOD/T2A

An ePOD/T2A change is required for the following logs:

  • Log

OR

There are no ePOD/T2A changes required.

MCS

An MCS change is required for the following logs:

  • Log

OR

There are no MCS changes required.

PORTAL/TTM

A Portal change is required for the following logs:

  • Log

OR

There are no Portal changes required.

EDI

An EDI change is required for the following logs:

  • Log

OR

There are no EDI changes required.