Line 5: Line 5:
|Supimix_Client_Reference= 
|Supimix_Client_Reference= 
|Supimix_Number=324098
|Supimix_Number=324098
|The_version_of_the_document=0.1
|The_version_of_the_document=0.3
|Your_Name=A N Walker
|Your_Name=A N Walker
|Supimix_PO_Reference= 
|Supimix_PO_Reference= 
|Supimix_Priority=3
|Supimix_Priority=3
|Date_(DD/MM/YY)=24/03/2015
|Date_(DD/MM/YY)=7/08/2018
|Clients_Customer=Wyvern Cargo
|Clients_Customer=Swains
|System_Version_being_changed=1.X
|System_Version_being_changed=4.X
|Client_Request=
|Client_Request=A working interface to Fortec.
Wyvern Cargo will be rolling out ''CALIDUS'' ePOD to their fleet and will need to send ePOD information/confirmation on deliver completion through to ForTec's ForTrack system.
|OBS_Solution=
|OBS_Solution=
{{Note}} This change requires integration with another system, so up to 1 day has been added to the specification and testing time to allow for this. If the specification time increases beyond this time allowed due to additional work required during this stage, the estimate will be increased to cover the actual time taken.
{{Note}} This change requires integration with another system, so up to 1 day has been added to the specification and testing time to allow for this. If the specification time increases beyond this time allowed due to additional work required during this stage, the cost will be increased to cover the actual time taken.




Assumptions:
'''Assumptions:'''
* Jobs will be sent to Partnerlink and through to ''CALIDUS'' ePOD using the existing JobShare interfaces.
* Jobs will be sent to Partnerlink and through to ''CALIDUS'' ePOD using the existing JobShare interfaces.
* Pallets for these Pallet Networks will be labelled with their own network's pallet labels, and not Partnerlink labels, like PalletForce.
* Pallets for these Pallet Networks will be labelled with their own network's pallet labels, and not Partnerlink labels.
* The new partners will accept updates into their Transport systems from ''CALIDUS'' EPOD in the standard OBS format - the pallet network system will be updated separately.
* The partners will accept updates into their Transport systems from ''CALIDUS'' EPOD in the standard OBS format - the pallet network system will be updated separately.
* The Consignment will already exist within the ForTec ForTrack system, ready for updating with POD information from ''CALIDUS'' ePOD.
* The Consignment will already exist within the ForTec ForTrack2 system, ready for updating with POD information from ''CALIDUS'' ePOD.
* Wyvern Cargo will be assigned a Partner Code by Partnerlink, which will be provided to OBS Logistics prior to implementation of this change.


{{Note}} This process is dependent on multiple reason codes for pallet networks change, specified in EST 318572 PART Job Group Level Clausing - No Duplicates. The work for this change must be completed before or as part of this change.
{{Warning}} At this time, OBS Logistics is still expecting additional information regarding the interface to Fortec's ForTrack2 system. At this time, it is believed that the update will follow the process as laid out in this estimate. If details come to light at a later stage that affect this, the estimate or functional specification will be reissued with additional costs identified.


{{Warning}} At this time, OBS Logistics have not yet received a list of reason codes in use for the ForTrack system, so it is not yet known whether these reason codes used by ForTrack will cause any contention to the reason codes already in use in the system. If they do, further work will be required to the Reason Codes mechanism to allow a decoding of custom reason codes.


 
'''Process:'''
Process:
* A FORTRACK job group will be configured, following the same process as the other job groups in the system, configured the same way.
* The new partner Wyvern Cargo will be set up with a new partner code within ''CALIDUS'' ePOD, will be configured for their use following the standard configuration. This partner will be configured for export to the TMS system in use.
* ForTrack-specific reason codes will be set up as required by the ForTec ForTrack2 system. These will be set up as specific to job group FORTRACK and will be the only reason codes that may be selected when completing jobs of that group.
* ForTrack-specific reason codes will be set up as required by the ForTec ForTrack system.
* Swains Jobs will be sent to Partnerlink through the existing JobShare format, or directly to the back-end TMSs.
* New Wyvern Cargo Jobs will be sent to Partnerlink through the existing JobShare format, or directly to the back-end TMSs.
* When planned, these jobs will be sent to ''CALIDUS'' ePOD through the existing interface in use for the existing partners, and will be identified with a new Job Group FORTRACK. {{Note}} This will require change to the sending process from the TMS system to accommodate this new job group, and the consignment number will also be sent - Swain's TMS provider will be required to make these changes.
* When planned, these jobs will be sent to ''CALIDUS'' ePOD through the existing interface in use for the existing partners, and will be identified with a new Job Group e.g. FORTRACK. Note: This will require change to the sending process from the TMS system to accommodate this new job group.
* The jobs will be completed like any other normal delivery.
* The jobs will be completed like any other normal delivery.
* When jobs are completed, the existing AutoExport functionality will update the Partner (identified through the Partner Code) using a flat-file export of the job details in OBS Logistics' XML format, as it does with each existing partner.
* When jobs are completed, the existing AutoExport functionality will update the Partner (identified through the Partner Code) using a flat-file export of the job details in OBS Logistics' XML format, as it does with each partner.
* The AutoExport process will also export the files to ForTec ForTrack system, identified through the Job's Group and the configuration attached to it.
* The AutoExport process will also export the files to ForTec ForTrack2 system, identified through the Job's Group and the configuration attached to it.
* The AutoExport functionality will store the success or failure of the export, along with any of the returned reasons from the export.
* The AutoExport functionality will store the success or failure of the exports, along with any of the returned reasons from the export.




Line 53: Line 49:
The new ForTrack Export process will work as follows:
The new ForTrack Export process will work as follows:


If a job is marked as successfully completed, the following files will be created for the job:
If a job is marked as successfully completed, a delivery file will be created, showing the status of all the pallets, confirming the delivery. This will include:
* A Delivery file will be created, showing the status of all the pallets, confirming the delivery.
* The Consignee Code
* A Signature file will be created, containing the signature for the job.
* The Trip Number
* The Delivery details, consisting of:
** The package number
** The latitude and longitude when delivered (if available)
** The Consignment Number
** Discrepancy Codes (if applicable)
** The Date and Time
* The signatory
* The signature for the job.
 
Discrepancy codes will be added only when an item has failed to be delivered - there are no specific clause codes for Fortec deliveries, although some may be added solely for internal Swains use.


If a job is marked as cancelled (i.e. not delivered), a FailedDelivery file will be created for the job, showing the reason the job failed, and listing all pallets for that job.
Package numbers will be generated from the Consignment Number provided, plus a unique 3-digit numerical count.


The files will then be named appropriately and uniquely and sent via FTP to the ForTrack system. The result of the sending process will be stored in the Audit tables within ''CALIDUS'' ePOD. Messages that process in error will be marked as such, so that they may be identified and reprocessed manually if required.
If a job is marked as cancelled (i.e. not delivered), the same file will be created for the job, showing the reason the job failed. The reason description will be sent, from the list of Fortec reason codes.  


The files will then be named appropriately and uniquely and sent via FTP to the ForTrack2 system. The result of the sending process will be stored in the Audit tables within ''CALIDUS'' ePOD. Messages that process in error will be marked as such, so that they may be identified and reprocessed manually if required.
|Requirements_Days=0
|Requirements_Days=0
|Estimation_Days=1
|Estimation_Days=2.5
|Functional_Specification_Days=1.75
|Functional_Specification_Days=1.25
|Technical_Specification_Days=1.25
|Technical_Specification_Days=0.00
|Development_Days=6.25
|Development_Days=5.00
|Testing_and_Release_Days=1.25
|Testing_and_Release_Days=1.00
|Implementation_Days=1
|Implementation_Days=0.5
|Project_Management_Days=0.75
|Project_Management_Days=0.25
|Year=2015
|Year=2018
|Free_Of_Charge=N
|Free_Of_Charge=N
}}
}}

Latest revision as of 09:36, 7 August 2018

Aptean Logo.png
STATEMENT OF WORK
CHANGE REQUEST ESTIMATE
ClientPARTProjectDEVSitePART
Client Reference Aptean Reference324098Estimate Version0.3
Prepared ByA N WalkerEstimate Date7/08/2018
Invoice Reference Priority3
CustomerSwainsSystem Version4.X


Client Request
A working interface to Fortec.


Aptean Solution
Note Note: This change requires integration with another system, so up to 1 day has been added to the specification and testing time to allow for this. If the specification time increases beyond this time allowed due to additional work required during this stage, the cost will be increased to cover the actual time taken.


Assumptions:

  • Jobs will be sent to Partnerlink and through to CALIDUS ePOD using the existing JobShare interfaces.
  • Pallets for these Pallet Networks will be labelled with their own network's pallet labels, and not Partnerlink labels.
  • The partners will accept updates into their Transport systems from CALIDUS EPOD in the standard OBS format - the pallet network system will be updated separately.
  • The Consignment will already exist within the ForTec ForTrack2 system, ready for updating with POD information from CALIDUS ePOD.

Warning Warning: At this time, OBS Logistics is still expecting additional information regarding the interface to Fortec's ForTrack2 system. At this time, it is believed that the update will follow the process as laid out in this estimate. If details come to light at a later stage that affect this, the estimate or functional specification will be reissued with additional costs identified.


Process:

  • A FORTRACK job group will be configured, following the same process as the other job groups in the system, configured the same way.
  • ForTrack-specific reason codes will be set up as required by the ForTec ForTrack2 system. These will be set up as specific to job group FORTRACK and will be the only reason codes that may be selected when completing jobs of that group.
  • Swains Jobs will be sent to Partnerlink through the existing JobShare format, or directly to the back-end TMSs.
  • When planned, these jobs will be sent to CALIDUS ePOD through the existing interface in use for the existing partners, and will be identified with a new Job Group FORTRACK. Note Note: This will require change to the sending process from the TMS system to accommodate this new job group, and the consignment number will also be sent - Swain's TMS provider will be required to make these changes.
  • The jobs will be completed like any other normal delivery.
  • When jobs are completed, the existing AutoExport functionality will update the Partner (identified through the Partner Code) using a flat-file export of the job details in OBS Logistics' XML format, as it does with each partner.
  • The AutoExport process will also export the files to ForTec ForTrack2 system, identified through the Job's Group and the configuration attached to it.
  • The AutoExport functionality will store the success or failure of the exports, along with any of the returned reasons from the export.


The Admin Export Configuration screen will be changed to allow the parameters for the new ForTrack extract to be specified against it.


The CALIDUS ePOD system will be modified to store the GPS co-ordinates against the job at certain times:

  • At Start Job
  • At Arrive Job
  • At Complete job

These will be included in the information sent to the ForTrack system.


The new ForTrack Export process will work as follows:

If a job is marked as successfully completed, a delivery file will be created, showing the status of all the pallets, confirming the delivery. This will include:

  • The Consignee Code
  • The Trip Number
  • The Delivery details, consisting of:
    • The package number
    • The latitude and longitude when delivered (if available)
    • The Consignment Number
    • Discrepancy Codes (if applicable)
    • The Date and Time
  • The signatory
  • The signature for the job.

Discrepancy codes will be added only when an item has failed to be delivered - there are no specific clause codes for Fortec deliveries, although some may be added solely for internal Swains use.

Package numbers will be generated from the Consignment Number provided, plus a unique 3-digit numerical count.

If a job is marked as cancelled (i.e. not delivered), the same file will be created for the job, showing the reason the job failed. The reason description will be sent, from the list of Fortec reason codes.

The files will then be named appropriately and uniquely and sent via FTP to the ForTrack2 system. The result of the sending process will be stored in the Audit tables within CALIDUS ePOD. Messages that process in error will be marked as such, so that they may be identified and reprocessed manually if required.


Warning Warning: Unknown costs for client/year (PART/2018)
Cost Details
Activity Hours Rate per hour (£) Cost (£ Exc. VAT)
Requirements 0.00 0.00 £0.00
Change Request Evaluation 2.50 0.00 £0.00
Functional Specification 1.25 0.00 £0.00
Technical Specification 0.00 0.00 £0.00
Development 5.00 0.00 £0.00
Testing and Release 1.00 0.00 £0.00
Implementation 0.50 0.00 £0.00
Project Management 0.25 0.00 £0.00
 
TOTAL 10.50   £0.00
Estimate excludes training, release to live and go live support.


Copyright © Aptean 2018.
This estimate has an expiry date of 30 days from the specified Estimate Date.
The information contained herein is supplied without liability for errors or omissions.