TEST: Difference between revisions
From Calidus HUB
No edit summary |
No edit summary |
||
Line 23: | Line 23: | ||
= Introduction = | = Introduction = | ||
<!-- The introduction will detail the initial requirements supplied by the client --> | <!-- The introduction will detail the initial requirements supplied by the client --> | ||
This document is the {{#var:Doc_Title}}. | This document is the {{#var:Doc_Title}}. | ||
== Objective == | |||
The primary purpose of this document is to document the requirements gathered from {{#var:ClientName}}, at the following meetings: | |||
* Initial meeting in Swindon - Demo provided with website data. | |||
* Second meeting at Customer reference site (Brett Martin). | |||
* Third meeting - Pre-Sales Workshop with detailed demo | |||
* The document has been amended with feedback from the customer, culminating in a review meeting on 05/07/2017. | |||
<!-- List all amendments to the requirements here, and reference in final section, e.g. The document also encompasses the follow-up meeting held at X, with Y and Z attending, where the requirements were modified. See the minutes of the meeting referenced as item X in appendix B --> | |||
This document has been written in a manner such that it can be approved by non-technical representatives of {{#var:ClientName}} whilst also being of sufficient detail to allow the Functional or Technical Specification phase for this area to begin. | |||
== Scope and Limitations == | |||
This document is based on the documentation provided by {{#var:ClientName}}, as well as information gleaned from site visits and workshops with {{#var:ClientName}}. | |||
<!-- ANY scope or limitations, bulleted. --> | |||
* The changes will be made in the latest version of the {{#var:System}} system, operating the Android version of the C-ePOD Client application. | |||
* Changes relating to information passed through to {{#var:System}} from external systems (i.e. WMS/ERP) are subject to analysis and design, which may affect the other changes in this document or generate other work if the process described within this document cannot be followed by the external system. | |||
* Modifications are required to the customer systems (WMS/ERP) to achieve the functionality described in this document. | |||
* This document specifies changes for Lot Capture. It must be noted that this is ''not'' functionality for Lot Traceability, just the capture of the Lot numbers, to be passed back to the customer's WMS/ERP on Radial Deliveries only. None of the OBS systems included in this implementation will display or search for the captured Lot numbers. | |||
* This document specifies Loading and Unloading being performed by warehouse staff, not the drivers. It must be noted that ''CALIDUS'' ePOD is not a replacement for an RF-enabled Warehouse Management/Control system. Existing functionality and creative load building within the customer's systems is being used so that C-ePOD may be used for this purpose, but this is not the primary purpose of the application. | |||
* For Lot traceability, it would normally be expected that this be captured by the WMS/ERP and a unique item label produced for that order, identifying the Lot and Product implicitly. An item label has now been provided as part of the process, but this is not linked to the Lot number by the customer's systems. | |||
<!-- ANY other systems? e.g. does this link to TTM, WMS, 414, 770, etc? --> | |||
{{ #vardefine: SCR | 0 }} | {{ #vardefine: SCR | 0 }} | ||
<!-- NEW PAGE --> | <!-- NEW PAGE --> | ||
= Client Requirements = | = Client Requirements = | ||
I have attached the new POD to this email. Please generate an estimate for the changes required and let me know when you can make them. Just to note, any config changes will need to be applied to all ePod sites, as we'd need these changes to be applied system wide. | I have attached the new POD to this email. Please generate an estimate for the changes required and let me know when you can make them. Just to note, any config changes will need to be applied to all ePod sites, as we'd need these changes to be applied system wide. | ||
Line 36: | Line 63: | ||
* If the delivery has more than 14 lines then the report will throw a page after the 14th line (the footer area will be blank). The next page will include the header again, the rest of the lines and the footer. The third page will then be the disclaimer. | * If the delivery has more than 14 lines then the report will throw a page after the 14th line (the footer area will be blank). The next page will include the header again, the rest of the lines and the footer. The third page will then be the disclaimer. | ||
* Using multiple fonts for the T&Cs is not necessary if this requires the text to be hard-coded. It is more important that the T&Cs can be edited in future. | * Using multiple fonts for the T&Cs is not necessary if this requires the text to be hard-coded. It is more important that the T&Cs can be edited in future. | ||
[[File:JBG POD page 1.jpg|border|600px]] | [[File:JBG POD page 1.jpg|border|600px]] | ||
[[File:JBG POD page 2.jpg|border|600px]] | [[File:JBG POD page 2.jpg|border|600px]] | ||
<!-- NEW PAGE --> | <!-- NEW PAGE --> |