REQ 356284 Changes to On-time Report: Difference between revisions
From Calidus HUB
(Review notes & changes) |
(v1.0 - Initial release to client) |
||
Line 4: | Line 4: | ||
{{#vardefine:System|''CALIDUS'' ePOD}} | {{#vardefine:System|''CALIDUS'' ePOD}} | ||
{{#vardefine:Doc_Title|Changes to On-time Report}} | {{#vardefine:Doc_Title|Changes to On-time Report}} | ||
{{#vardefine:Version|0 | {{#vardefine:Version|1.0}} | ||
{{#vardefine:Date|11th March 2019}} | {{#vardefine:Date|11th March 2019}} | ||
{{#vardefine:Reference|356284}} | {{#vardefine:Reference|356284}} | ||
Line 34: | Line 34: | ||
== Scope and Limitations == | == Scope and Limitations == | ||
This document is based on information provided by {{#var:ClientName}} in emails and points clarified and confirmed in subsequent emails. | This document is based on information provided by {{#var:ClientName}} in emails and points clarified and confirmed in subsequent emails. | ||
<!-- ANY scope or limitations, bulleted. --> | <!-- ANY scope or limitations, bulleted. --> | ||
*The changes will be made in the latest version of the {{#var:System}} system. | *The changes will be made in the latest version of the {{#var:System}} system. | ||
Line 47: | Line 46: | ||
== Report by Planned Date == | == Report by Planned Date == | ||
The requirement here is to allow the report to select by planned date instead of the current actual date, so that it will include any orders that have not yet been delivered. | The requirement here is to allow the report to select by planned date instead of the current actual date, so that it will include any orders that have not yet been delivered. | ||
The Proposed solution for this is an option on when requesting the report to select whether the entered date range applies to actual or planned date. | The Proposed solution for this is an option on when requesting the report to select whether the entered date range applies to actual or planned date. | ||
Note that incomplete orders without an actual date would be classed as 'not on time' even if the planned date is in the future. | Note that incomplete orders without an actual date would be classed as 'not on time' even if the planned date is in the future. | ||
Line 115: | Line 111: | ||
</ERRORS> | </ERRORS> | ||
</EPOD_REPORT_RESPONSE> | </EPOD_REPORT_RESPONSE> | ||
<!-- Any standard processes should be referenced here and in the references section --> | <!-- Any standard processes should be referenced here and in the references section --> |