|
|
Line 1: |
Line 1: |
| <div class="noprint"> | | <div class="noprint"> |
| {{#vardefine:Client|Aptean}} | | {{#vardefine:Client|<br />}} |
| {{#vardefine:System|''CALIDUS'' TMS}} | | {{#vardefine:System|''CALIDUS'' TMS}} |
| {{#vardefine:Doc_Title|Release Notes}} | | {{#vardefine:Doc_Title|Release Notes}} |
Line 80: |
Line 80: |
| |} | | |} |
| --> | | --> |
| == Customer Ref: ==
| | |
| {| width="100%"
| | |
| |-
| |
| |width="30%"|'''OBS Log Number:''' || '''Reporter:'''
| |
| |-
| |
| |'''Summary of Call'''||
| |
| |-
| |
| |'''Detail of Fix''' ||
| |
| |-
| |
| |'''Set-up and Configuration''' || No set-up/configuration required
| |
| |}
| |
| <!-- NEW PAGE -->
| |
| == Customer Ref: ==
| |
| {| width="100%"
| |
| |-
| |
| |width="30%"|'''OBS Log Number:''' || '''Reporter:'''
| |
| |-
| |
| |'''Summary of Call'''||
| |
| |-
| |
| |'''Detail of Fix''' ||
| |
| |-
| |
| |'''Set-up and Configuration''' || No set-up/configuration required
| |
| |}
| |
|
| |
|
|
| |
|
Revision as of 14:01, 24 January 2022
{{{Client}}}
Release Notes
CALIDUS TMS
14th January 2022 - 1.0
Reference: P041
SUMMARY INTRODUCTION
INTRODUCTION
The main aim of this document is to provide CALIDUS TMS users with the level of detail required to accurately test all software included in the patch. The document also contains set-up and configuration details to enable the user to configure the system correctly for the new functionality to work.
GLOSSARY OF TERMS
Term |
Meaning
|
C-TMS |
Transport Management System
|
C-WMS |
Warehouse Management System
|
CR |
Change Request
|
C-WCS |
Warehouse Control System
|
C-ePOD |
Electronic Proof of Delivery
|
C-MCS |
Mobile Control System
|
C-TTM |
Track and Trace Management
|
EDI |
Electronic Data Interchange
|
TID |
Testing Issue Development, or Log
|
TESTING PROCESS
TIDs AND RESOLUTION
If there are any areas of the functionality that are not acceptable or do not meet the requirement specified in the Change Request then these should be expressed by raising a TID.
FINAL 'END TO END' TESTING
Prior to release to a production database, a full 'End to End' test is required on the test system by all sites using the database. Once this is signed off, a release date can be arranged.
AUTHORISATION
Authorisation from nominated release personnel only will be required when requesting a release to a production environment
CHANGE REQUESTS
SUPPORT INCIDENTS
Customer Ref:
OBS Log Number: |
Reporter:
|
Summary of Call |
|
Detail of Fix |
|
Set-up and Configuration |
No set-up/configuration required
|
TID CHANGES
OBS Log Number:
Cust Ref: |
Reporter:
|
Summary of Call |
|
Detail of Fix |
|
Set-up and Configuration |
|
PRODUCT DEVELOPMENT
OBS Log Number:
Reporter: |
|
Summary of Call |
|
Detail of Fix |
|
Set-up and Configuration |
No set-up/configuration required
|
MODULES DELIVERED
Module Name |
Version No |
Description |
Log Number
|
|
|
|
|
ADDITIONAL CHANGES
WCS
A WCS change is required for the following logs:
OR
There are no WCS changes required.
EPOD/T2A
An ePOD/T2A change is required for the following logs:
OR
There are no ePOD/T2A changes required.
MCS
An MCS change is required for the following logs:
OR
There are no MCS changes required.
PORTAL/TTM
A Portal change is required for the following logs:
OR
There are no Portal changes required.
EDI
An EDI change is required for the following logs:
OR
There are no EDI changes required.
[[Category:
PATCH]]