ER CTMS 045-059: Difference between revisions

From Calidus HUB
(Created page with "<!-- MEDIA LANDSCAPE YES --> {{#vardefine:System|CTMS}} {{ERHeader |SystemVersion=CTMS 12.0 |ERNumber=ER045-059 }} {| class="wikitable" border="1" width="100%" |- bgcolor="sil...")
 
m (Text replacement - "[[Category:{{#var:System}} ER]]↵" to "[[Category:{{#var:System}} ER]]Category:ER CTMS 045")
 
(One intermediate revision by one other user not shown)
Line 31: Line 31:
|"
|"
|}
|}
{| class="wikitable" border="1" width="100%"
|- bgcolor="silver"
!colspan="4" | New Parameters
|-
!Parameter Name !! Config Level !! Setting Value !! Result
|-
|PAR_DUN_TRUNK_OFFSET_DAYS
|SYSTEM
|NUMERIC
|The specified number of days will be used to assess the trunk trips for the radial trips to account for the non-working days in the calendar.
|-
|PAR_DUN_TRUNK_OFFSET_DAYS
|SYSTEM
|NULL/NON-NUMERIC
|A default number of 4 days will be used as per the current functionality.
|}


<noinclude>
<noinclude>
[[Category:{{#var:System}} ER]]
[[Category:{{#var:System}} ER]][[Category:ER CTMS 045]]</noinclude>
</noinclude>

Latest revision as of 09:51, 14 July 2025


Aptean Logo.png


EMERGENCY RELEASE - CTMS 12.0


RELNOTE ER045-059


Module Program Name Ver Call/Iss Client Ref Pr'ty Remarks
DATA_ADM_SYSTEM_PARAM_02910494.sql Database Script 1.1 02910494 - 3 A new system parameter called 'PAR_DUN_TRUNK_OFFSET_DAYS' is available to store the number of days for which trunk trips will be assessed for the radial trips that are created by Paragon.

A default value of 4 days will be used but the number of days will be configurable to assess the non-working days for the depot. This system parameter can be used to account for the non-working days during the period of the holiday seasons.

The system parameter 'PAR_DUN_TRUNK_CUTOFF_TIME' will start to assess the current date prior to the cutoff time, or from tomorrow after the cutoff time.

PAR.sql Paragon Package 5.116 " " " "


New Parameters
Parameter Name Config Level Setting Value Result
PAR_DUN_TRUNK_OFFSET_DAYS SYSTEM NUMERIC The specified number of days will be used to assess the trunk trips for the radial trips to account for the non-working days in the calendar.
PAR_DUN_TRUNK_OFFSET_DAYS SYSTEM NULL/NON-NUMERIC A default number of 4 days will be used as per the current functionality.