PATCH C-TMS 11.0 P021: Difference between revisions

From Calidus HUB
No edit summary
No edit summary
Line 123: Line 123:
|}
|}


 
== Customer Ref: SCR-001 ==
{| width="100%"
|-
|width="30%"|'''OBS Log Number:'''|| '''333089'''
|-
|'''Reporter:'''|| Matthew Tipping
|-
|'''Summary of Call'''|| SCR-1 - Supply & service agreement scree
|-
|'''Detail of Fix''' || New BWSC screen for entering Agreements and generating C-TMS contracts
|-
|'''Set-up and Configuration''' || No set-up/configuration required
|}





Revision as of 10:38, 5 September 2016





Aptean Logo.png







OBS Logistics Ltd

Release Notes


CALIDUS C-TMS

30th August 2016 - 1.0
Reference: P021












































SUMMARY INTRODUCTION

INTRODUCTION

The main aim of this document is to provide CALIDUS C-TMS users with the level of detail required to accurately test all software included in the patch. The document also contains set-up and configuration details to enable the user to configure the system correctly for the new functionality to work.


GLOSSARY OF TERMS

Term Meaning
C-TMS Transport Management System
C-WMS Warehouse Management System
CR Change Request
C-WCS Warehouse Control System
C-ePOD Electronic Proof of Delivery
C-MCS Mobile Control System
C-TTM Track and Trace Management
EDI Electronic Data Interchange
TID Testing Issue Development, or Log


TESTING PROCESS

TIDs AND RESOLUTION

If there are any areas of the functionality that are not acceptable or do not meet the requirement specified in the Change Request then these should be expressed by raising a TID.


FINAL 'END TO END' TESTING

Prior to release to a production database, a full 'End to End' test is required on the test system by all sites using the database. Once this is signed off, a release date can be arranged.


AUTHORISATION

Authorisation from nominated release personnel only will be required when requesting a release to a production environment


CHANGE REQUESTS

Customer Ref: CR-18/PO:61544552

OBS Log Number: 330260 Reporter: Ed Bond
Summary of Call

CR-18a: Hand over to TNT and HOT

Detail of Fix

Hand over to TNT and HOT

Set-up and Configuration No set-up/configuration required

Customer Ref: SCR-001

OBS Log Number: 333089 Reporter: Matthew Tipping
Summary of Call SCR-1 - Supply & service agreement scree
Detail of Fix New screen for entering Agreements and generating C-TMS contracts
Set-up and Configuration No set-up/configuration required

Customer Ref: SCR-001

OBS Log Number: 333089
Reporter: Matthew Tipping
Summary of Call SCR-1 - Supply & service agreement scree
Detail of Fix New BWSC screen for entering Agreements and generating C-TMS contracts
Set-up and Configuration No set-up/configuration required

Customer Ref: SCR-001

OBS Log Number: 333089
Reporter: Matthew Tipping
Summary of Call SCR-1 - Supply & service agreement scree
Detail of Fix New BWSC screen for entering Agreements and generating C-TMS contracts
Set-up and Configuration No set-up/configuration required





Customer Ref: SCR-002 & 004

OBS Log Number: 333090 Reporter: Matthew Tipping
Summary of Call SCR-2 & 4 - Stack audit and inv manageme
Detail of Fix New forms for manually entering Stacks for BWSC only.
Set-up and Configuration No set-up/configuration required


Customer Ref: CR-18/PO:61544552

"{| width=""100%""" |- |width="30%"|OBS Log Number: " 330260 || Reporter: Ed Bond |- |Summary of Call|| CR-18a: Hand over to TNT and HOT |- |Detail of Fix || Hand over to TNT and HOT |Set-up and Configuration || No set-up/configuration required |}



SUPPORT INCIDENTS

Customer Ref:

OBS Log Number: Reporter:
Summary of Call
Detail of Fix
Set-up and Configuration No set-up/configuration required


TID CHANGES

OBS Log Number:

Cust Ref: Reporter:
Summary of Call
Detail of Fix
Set-up and Configuration


OBSL PRODUCT DEVELOPMENT

OBS Log Number:

Reporter:
Summary of Call
Detail of Fix
Set-up and Configuration No set-up/configuration required


MODULES DELIVERED

Module Name Version No Description Log Number


ADDITIONAL CHANGES

WCS

A WCS change is required for the following logs:

  • Log

OR

There are no WCS changes required.

EPOD/T2A

An ePOD/T2A change is required for the following logs:

  • Log

OR

There are no ePOD/T2A changes required.

MCS

An MCS change is required for the following logs:

  • Log

OR

There are no MCS changes required.

PORTAL/TTM

A Portal change is required for the following logs:

  • Log

OR

There are no Portal changes required.

EDI

An EDI change is required for the following logs:

  • Log

OR

There are no EDI changes required.