PATCH C-TMS 11.0 P021: Difference between revisions
From Calidus HUB
No edit summary |
No edit summary |
||
Line 397: | Line 397: | ||
|} | |} | ||
== Customer Ref: | == Customer Ref: 336863 == | ||
{| width="100%" | {| width="100%" | ||
|- | |- | ||
|width="30%"|'''OBS Log Number:'''|| 336863 | |width="30%"|'''OBS Log Number:'''|| 336863 | ||
|- | |- | ||
|'''Reporter: ''' || | |'''Reporter: ''' || Michelle Naumovski | ||
|- | |- | ||
|'''Summary of Call'''|| ORS - Select column order | |'''Summary of Call'''|| ORS - Select column order | ||
Line 425: | Line 425: | ||
|} | |} | ||
== Customer Ref: | == Customer Ref: 337123 == | ||
{| width="100%" | {| width="100%" | ||
|- | |- | ||
Line 439: | Line 439: | ||
|} | |} | ||
== Customer Ref: | == Customer Ref: 333896 == | ||
{| width="100%" | {| width="100%" | ||
|- | |- | ||
Line 448: | Line 448: | ||
|'''Summary of Call'''|| Microlise Interface (Inbound/Outbound) | |'''Summary of Call'''|| Microlise Interface (Inbound/Outbound) | ||
|- | |- | ||
|'''Detail of Fix''' || New package DP_INT_XML_MIC2 to handle XML files to and from Microlise. Database triggers have been amended so that if MIC_SEND_DIRECT registry value set to Yes, outbound | |'''Detail of Fix''' || New package DP_INT_XML_MIC2 to handle XML files to and from Microlise. Database triggers have been amended so that if MIC_SEND_DIRECT registry value set to Yes, outbound Microlise files are processed and sent directly to Microlise, using their file format, rather than the standard OBS format. | ||
|- | |- | ||
|'''Set-up and Configuration''' || No set-up/configuration required | |'''Set-up and Configuration''' || No set-up/configuration required | ||
Line 495: | Line 495: | ||
|} | |} | ||
== Customer Ref: | == Customer Ref: 336197 == | ||
{| width="100%" | {| width="100%" | ||
|- | |- | ||
Line 518: | Line 518: | ||
|'''Summary of Call'''|| RIO: CTMS to MLS WMS Interface | |'''Summary of Call'''|| RIO: CTMS to MLS WMS Interface | ||
|- | |- | ||
|'''Detail of Fix''' || A new EDI process will need to be setup as follows: | |'''Detail of Fix''' || A new EDI process will need to be setup as follows: | ||
Process Name: BNLMLS_PLAN_OUT | |||
Filename Format: Planresultaat | |||
Customer: As Customer (see FS) | |||
Cost Centre Code: As Cost Centre (see FS) | |||
Location: As Depot (see FS) | |||
Direction: Outbound | |||
Flow Type: PROCESS | |||
Frequency Type: Interval | |||
Interval Length: 2 Minutes | |||
Delivery Folder: /webint/{DATABASE}/interface/ORDXML/{CUST}/OUT | |||
Archive Folder: /webint/{DATABASE}/interface/ORDXML/{CUST}/OUT/archive | |||
Failures Folder: /webint/{DATABASE}/interface/ORDXML/{CUST}/OUT/failures | |||
Triggers: | |||
STATUS: ACCEPTED | |||
STATUS: TENDERED | |||
Parameters: | |||
DELIMITER: PIPE | |||
ORDER_SOURCE_SYSTEM: As Source System (see FS) | |||
Report Values: | |||
Title: Package Name | |||
Name: PROCESS | |||
Value: DP_BNL_EDI_OUT.P_PROCESS_PLAN | |||
Title: Process Name | |||
Name: pi_proc_name | |||
Value: BNLMLS_PLAN_OUT | |||
The following directory structure will need to be setup: | |||
/webint/{DATABASE}/interface/ORDXML/{CUST}/OUT | |||
/webint/{DATABASE}/interface/ORDXML/{CUST}/OUT/archive | |||
/webint/{DATABASE}/interface/ORDXML/{CUST}/OUT/failures | |||
The OBS FTP Server will need to be setup to transfer the 'Plan' files from CTMS. | |||
The external systems will need to be setup to receive the 'Plan' files from the OBS FTP Server. | |||
A new system directory will need to be setup for the outbound EDI directory for the 'Plan' files. | |||
|- | |- | ||
|'''Set-up and Configuration''' || No set-up/configuration required | |'''Set-up and Configuration''' || No set-up/configuration required | ||
Line 532: | Line 584: | ||
|'''Summary of Call'''|| RIO: MLS WMS to C-TMS Interface | |'''Summary of Call'''|| RIO: MLS WMS to C-TMS Interface | ||
|- | |- | ||
|'''Detail of Fix''' || A new EDI process will need to be setup as follows: Process Name: BNLMLS_ORDERS Filename Format: tms_sscc_CRE_*.dat Customer: As Customer (see FS) Cost Centre Code: As Cost Centre (see FS) Location: As Depot (see FS) Direction: Inbound Flow Type: PROCESS Frequency Type: Interval Interval Length: 2 Minutes | |'''Detail of Fix''' || | ||
A new EDI process will need to be setup as follows: | |||
Process Name: BNLMLS_ORDERS | |||
Filename Format: tms_sscc_CRE_*.dat | |||
Customer: As Customer (see FS) | |||
Cost Centre Code: As Cost Centre (see FS) | |||
Location: As Depot (see FS) | |||
Direction: Inbound | |||
Flow Type: PROCESS | |||
Frequency Type: Interval | |||
Interval Length: 2 Minutes | |||
Delivery Folder: /webint/{DATABASE}/interface/ORDXML/{CUST}/IN | |||
Archive Folder: /webint/{DATABASE}/interface/ORDXML/{CUST}/IN/archive | |||
Failures Folder: /webint/{DATABASE}/interface/ORDXML/{CUST}/IN/failures | |||
Parameters: | |||
DEFAULT_DEL_TYPE: Standard | |||
DEFAULT_GROUP_NAME: As Group Name (see FS) | |||
DEFAULT_PROD_TYPE_ID: AMBIENT | |||
DEFAULT_SRCE_SYSTEM: As Source System (see FS) | |||
DELIMITER: | | |||
EARLY_AVAILABLE_TIME: 0000 | |||
LATE_AVAILABLE_TIME: 1200 | |||
USE_DIMENSIONS: Y | |||
Report Values: | |||
Title: Package Name | |||
Name: PROCESS | |||
Value: DP_BNL_EDI_IN.P_PROCESS_FILES | |||
Title: Process Name | |||
Name: pi_proc_name | |||
Value: BNLMLS_ORDERS | |||
The following static data will need to be setup: | |||
Locations: Depot, Stores and Suppliers (see FS) | |||
Product Types: Ambient | |||
Despatch Unit Types: For Pallet Types (see FS) | |||
Source System: For Source System (see FS) | |||
Delivery Types: Standard | |||
Group Names: As Customer Group (see FS) | |||
Import Decodes: | |||
BNLDIY_LOCATIONS: As Stores and Suppliers from Source System (see FS) | |||
BNLDIY_XDOCK: | |||
Source Value: XD | |||
Target Value: As Depot (see FS) ] | |||
The following tab page will need to be authorised for the appropriate user groups: | |||
Form: Interface Errors | |||
Tab: BNL Orders In | |||
The following directory structure will need to be setup: | |||
/webint/{DATABASE}/interface/ORDXML/{CUST}/IN | |||
/webint/{DATABASE}/interface/ORDXML/{CUST}/IN/archive | |||
/webint/{DATABASE}/interface/ORDXML/{CUST}/IN/failures | |||
The OBS FTP Server will need to be setup to transfer the 'Ship' files to CTMS. | |||
The external systems will need to be setup to transfer the 'Ship' files to the OBS FTP Server. | |||
|- | |- | ||
|'''Set-up and Configuration''' || No set-up/configuration required | |'''Set-up and Configuration''' || No set-up/configuration required | ||
Line 546: | Line 668: | ||
|'''Summary of Call'''|| Delivery Note Print | |'''Summary of Call'''|| Delivery Note Print | ||
|- | |- | ||
|'''Detail of Fix''' || New Delivery Report | |'''Detail of Fix''' || New Delivery Report, to be generated from the reports screen and the Planning Trip tree | ||
|- | |- | ||
|'''Set-up and Configuration''' || No set-up/configuration required | |'''Set-up and Configuration''' || No set-up/configuration required | ||
Line 560: | Line 682: | ||
|'''Summary of Call'''|| Loading Meters | |'''Summary of Call'''|| Loading Meters | ||
|- | |- | ||
|'''Detail of Fix''' || The configurable layouts for the order items data block in the Order Details screen will be changed to include 3 extra columns for the length, width and height. A new system parameter called ORD_EDIT_RPE will be available to configure by cost centre to allow the RPE quantity of the order lines in the Order Details screen to be edited. | |'''Detail of Fix''' || The configurable layouts for the order items data block in the Order Details screen will be changed to include 3 extra columns for the length, width and height. | ||
A new system parameter called ORD_EDIT_RPE will be available to configure by cost centre to allow the RPE quantity of the order lines in the Order Details screen to be edited. | |||
A new system parameter called ORD_RPE_LM_FACTOR will be available to configure by cost centre to set a loading meter factor to calculate the RPE quantity of the order lines based on the dimensions of the DU types of the order items in preference to the RPE quantity of the DU types themselves (which should be set based on the loading meter factor). | |||
The RPE quantity, weight and volume of the order lines will be based on the order items with reference to the system parameters for the manual order entry and maintenance and the processing of the EDI Ship file that provides the parent and child items for the orders. | |||
See the functional specification for further information about the setup in CTMS and the OBS FTP Server. | |||
|- | |- | ||
|'''Set-up and Configuration''' || No set-up/configuration required | |'''Set-up and Configuration''' || No set-up/configuration required | ||
Line 586: | Line 716: | ||
|'''Reporter: ''' || Rob Merrill | |'''Reporter: ''' || Rob Merrill | ||
|- | |- | ||
|'''Summary of Call'''|| Log for release of internal testing | |'''Summary of Call'''|| Log for release of internal testing issue | ||
|- | |- | ||
|'''Detail of Fix''' || Changes to Threshold calculation and call-off-month | |'''Detail of Fix''' || Changes to Threshold calculation and call-off-month. | ||
|- | |- | ||
|'''Set-up and Configuration''' || No set-up/configuration required | |'''Set-up and Configuration''' || No set-up/configuration required | ||
Line 616: | Line 746: | ||
|'''Summary of Call'''|| SCR-001 - Testing Issues | |'''Summary of Call'''|| SCR-001 - Testing Issues | ||
|- | |- | ||
|'''Detail of Fix''' || Various changes to the screen: 1. Includes cost centre segregation for the Find functionality. 2. The 'x' button can be used to close windows that are called. 3. The red field background will be converted to grey and vice versa when the total weight is changed and assessed. | |'''Detail of Fix''' || Various changes to the screen: | ||
1. Includes cost centre segregation for the Find functionality. | |||
2. The 'x' button can be used to close windows that are called. | |||
3. The red field background will be converted to grey and vice versa when the total weight is changed and assessed. | |||
|- | |- | ||
|'''Set-up and Configuration''' || No set-up/configuration required | |'''Set-up and Configuration''' || No set-up/configuration required | ||
Line 630: | Line 766: | ||
|'''Summary of Call'''|| CR18a: additional | |'''Summary of Call'''|| CR18a: additional | ||
|- | |- | ||
|'''Detail of Fix''' || | |'''Detail of Fix''' || Fix for suto debrief on HOT and TNT | ||
|- | |- | ||
|'''Set-up and Configuration''' || No set-up/configuration required | |'''Set-up and Configuration''' || No set-up/configuration required | ||
Line 658: | Line 794: | ||
|'''Summary of Call'''|| Release of agreements screen | |'''Summary of Call'''|| Release of agreements screen | ||
|- | |- | ||
|'''Detail of Fix''' || Format and Functional amendments to the Agreement | |'''Detail of Fix''' || Format and Functional amendments to the Agreement screen to allow release excluding the Finance log | ||
|- | |- | ||
|'''Set-up and Configuration''' || No set-up/configuration required | |'''Set-up and Configuration''' || No set-up/configuration required |