SUMMARY INTRODUCTION

INTRODUCTION

The main aim of this document is to provide CALIDUS TMS users with the level of detail required to accurately test all software included in the patch. The document also contains set-up and configuration details to enable the user to configure the system correctly for the new functionality to work.


GLOSSARY OF TERMS

Term Meaning
C-TMS Transport Management System
C-WMS Warehouse Management System
CR Change Request
C-WCS Warehouse Control System
C-ePOD Electronic Proof of Delivery
C-MCS Mobile Control System
C-TTM Track and Trace Management
EDI Electronic Data Interchange
TID Testing Issue Development, or Log


TESTING PROCESS

TIDs AND RESOLUTION

If there are any areas of the functionality that are not acceptable or do not meet the requirement specified in the Change Request then these should be expressed by raising a TID.


FINAL 'END TO END' TESTING

Prior to release to a production database, a full 'End to End' test is required on the test system by all sites using the database. Once this is signed off, a release date can be arranged.


AUTHORISATION

Authorisation from nominated release personnel only will be required when requesting a release to a production environment


CHANGE REQUESTS

Customer Ref:

OBS Log Number: Reporter:
Summary of Call
Detail of Fix
Set-up and Configuration No set-up/configuration required

Customer Ref:

OBS Log Number: Reporter:
Summary of Call
Detail of Fix
Set-up and Configuration No set-up/configuration required


SUPPORT INCIDENTS

Customer Ref:

OBS Log Number: Reporter:
Summary of Call
Detail of Fix
Set-up and Configuration No set-up/configuration required


TID CHANGES

OBS Log Number:

Cust Ref: Reporter:
Summary of Call
Detail of Fix
Set-up and Configuration


PRODUCT DEVELOPMENT

Log Number: 00474454

Summary of Call Missing auditing for COL export events in the API
Detail of Fix The web service audit records will be created for the COL events as well as the VLI, VLD and VUI events.
Set-up and Configuration No set-up/configuration required


Log Number: 00489063

Summary of Call Revert tier for pallet storage
Detail of Fix The tier for the 'Warehouse' screen will revert to 'WAREHOUSE'.
Set-up and Configuration No set-up/configuration required


Log Number: 00482059

Summary of Call Enable RET orders to be added to PCL trips in the 3PL scheduling engine
Detail of Fix Code change - changed the DP_3PL-SCHED package to allow RET orders to be added to PCL trips
Set-up and Configuration No set-up/configuration required


Log Number: 00489611

Summary of Call Duplication with TMS Orders
Detail of Fix Any orders that are locked will not be submitted to the 3PL scheduling engine until they have been unlocked.
Set-up and Configuration No set-up/configuration required


Log Number: 00481867

Summary of Call Include the Send to Paragon flag in the import process for Fixed Routes
Detail of Fix Send To Paragon flag added to Import

Any new order lines should trigger an update to the Paragon API when the order is UNSCHEDULED not INVALID.

Set-up and Configuration No set-up/configuration required


Log Number: 00497948

Summary of Call Main version for DP_CARRIER_API
Detail of Fix Changes from branched version incorporated into main version

The functionality that is controlled by the system parameter 'CARRIER_API_MANIFEST_READY_TIME': setting it to a time will allow the bookingDate to refer to the packed date or the created date of the order instead of the late delivery date.

Set-up and Configuration No set-up/configuration required



MODULES DELIVERED

Module Name Version No Description Log Number


ADDITIONAL CHANGES

WCS

A WCS change is required for the following logs:

  • Log

OR

There are no WCS changes required.

EPOD/T2A

An ePOD/T2A change is required for the following logs:

  • Log

OR

There are no ePOD/T2A changes required.

MCS

An MCS change is required for the following logs:

  • Log

OR

There are no MCS changes required.

PORTAL/TTM

A Portal change is required for the following logs:

  • Log

OR

There are no Portal changes required.

EDI

An EDI change is required for the following logs:

  • Log

OR

There are no EDI changes required.