ER WMS 045-001

From Calidus HUB
Revision as of 14:16, 14 July 2025 by Anw (talk | contribs) (Text replacement - "[[Category:{{#var:System}} ER]]↵</noinclude>" to "[[Category:{{#var:System}} ER]]Category:ER WMS 045 </noinclude>")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Aptean Logo.png


EMERGENCY RELEASE - WMS 810


RELNOTE ER045-001


Module Program Name Ver Call/Iss Client Ref Pr'ty Remarks
DP_WHS0150.sql Goods Receipt Confirmation 4.58 556490 - 2 The goods receipt confirmation process will now check the new GRIR warehouse rule when confirming a GRN. It will only run the procedure to re-sequence the IAJD records written by the goods receipt process if the rule is set to 'Y'.
DATA_WAREHOUSE_RULES_CONTROL_556490.sql Data Script 4.1 " " " "
DATA_WAREHOUSE_RULES_556490.sql Data Script 4.1 " " " "


New Parameters
Parameter Name Config Level Setting Value Result
GRIR warehouse rule WHSE Y IAJD records written by the Goods Receipt Confirmation process will be re-sequenced (by line number) to put the manual holds after the system hold and receipt, e.g. REC - HOLD (90) - HOLD (HS).
GRIR warehouse rule WHSE Other or not set IAJD records will not be re-sequenced so manual holds will be before the REC and system HOLD.