EST 337120 Sterling Portal Interface
![]() |
CHANGE REQUEST ESTIMATE |
Client | PART | Project | DEV | Site | PART |
Client Reference | PL-STERLING PORTAL | Aptean Reference | 337120 | Estimate Version | 0.1 |
Prepared By | A N Walker | Estimate Date | 13/09/16 | ||
'Invoice Reference | ' | Priority | 3 | ||
Customer | ALL | System Version | 3.3.X |
Client Request |
From Stirling - Phil Hall on Tuesday, 26 July, 2016 4:28 PM, cc John Davidson.
|
Aptean Solution |
![]()
The database will be modified to create an Export Control record for each job that requires it, at the point that a job is set to Completed or Cancelled status. This will be triggered by the database at the point of completion and will be largely sourced from the existing package that decides which configuration requires an export. These changes will reduce development costs and increase the speed of the export process. The process will be modified slightly to obey the configuration against the site, rather than requiring the configuration to be the same name as the site code - this is required to allow the control records to be written. As the control records are being written based off the configuration against the site and job group, the new configuration added will result in a new control file being created for the new export to Stirling's Portal system.
The process will 'batch' similar export files together, and produce the XML once only, replicating this to several files. The process will produce the files in a temporary area, and will send all FTP files for the same destination at the same time. Only then will a file be marked as successfully sent. Any issues with creating or sending the export file will result in the Error or Reprocess status being set against the control record, as normal.
|
![]() | Unknown costs for client/year (PART/2016) |
Cost Details | |||
Activity | Hours | Rate per hour (£) | Cost (£ Exc. VAT) |
Requirements | 0.00 | 0.00 | £0.00 |
Change Request Evaluation | 0.50 | 0.00 | £0.00 |
Functional Specification | 2.50 | 0.00 | £0.00 |
Technical Specification | 2.50 | 0.00 | £0.00 |
Development | 10.50 | 0.00 | £0.00 |
Testing and Release | 2.50 | 0.00 | £0.00 |
Implementation | 0.25 | 0.00 | £0.00 |
Project Management | 0.75 | 0.00 | £0.00 |
TOTAL | 19.50 | £0.00 |
Estimate excludes training, release to live and go live support. |