EST 316159 Partnerlink Cancel and Redelivery method

From Calidus HUB
Revision as of 12:34, 27 March 2014 by Anw (talk | contribs) (v0.1 - Initial Creation)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Aptean Logo.png
STATEMENT OF WORK
CHANGE REQUEST ESTIMATE
ClientPARTProjectDEVSitePART
Client Reference Aptean Reference316159Estimate Version0.1
Prepared ByA WalkerEstimate Date17/03/2014
Invoice ReferenceUnknownPriority3
CustomerN/ASystem VersionLatest


Client Request
ePOD functionality required for Cancellation and Redelivery.


Aptean Solution
Description of problem

The Auto-Import functionality for the Partnerlink JobShare format currently checks whether the job exists by checking the Site, Job Code and Type (Collection or Delivery) passed in. If found, this is seen to be an update of the existing job. As the job that is found has been cancelled already, the system will not update the job, to preserve the activity trail.

Solution

The process will be modified to recognise that confirmed jobs (at completed or cancelled status) should not be updated, but instead a new job created, if the Load specified on the incoming file is different to what the system has against the job.

In detail:

  • If the Job does not exist, a new job will be created.
  • If the Job exists, at status Completed or Cancelled, and the Load ID on file is different to that in the incoming file, a new job will be created.
  • If the Job exists, at status Completed or Cancelled, and the Load ID on file is the same as the incoming file, the job update will not occur - a reject reason will be posted in the interface logs.
  • If the Job exists, at status In Progress or Pending, the job found will be updated with the details on the incoming file.


Cost Details
Activity Hours Rate per hour (£) Cost (£ Exc. VAT)
Requirements 0.00 0 £0.00
Change Request Evaluation 0.25 0 £0.00
Functional Specification 0.25 0 £0.00
Technical Specification 0.00 0 £0.00
Development 1.00 0 £0.00
Testing and Release 0.50 0 £0.00
Implementation 0.00 0 £0.00
Project Management 0.00 0 £0.00
 
TOTAL 2.00   £0.00
Estimate excludes training, release to live and go live support.


Copyright © Aptean 2014.
This estimate has an expiry date of 30 days from the specified Estimate Date.
The information contained herein is supplied without liability for errors or omissions.