Vision Overview Appendix: Difference between revisions
From Vision
No edit summary |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=Appendix A: Document History= | |||
<p><font size="4">'''A.1 References'''</font></p> | <p><font size="4">'''A.1 References'''</font></p> | ||
<table width="100%" border="1"> | <table width="100%" border="1"> | ||
Line 23: | Line 24: | ||
<tr><td>0.1</td><td>09/05/2011</td><td>Draft</td><td>Initial draft</td><td>ANW</td></tr> | <tr><td>0.1</td><td>09/05/2011</td><td>Draft</td><td>Initial draft</td><td>ANW</td></tr> | ||
<tr><td>1.0</td><td>09/05/2011</td><td>Issue</td><td>Issued</td><td>ANW</td></tr> | <tr><td>1.0</td><td>09/05/2011</td><td>Issue</td><td>Issued</td><td>ANW</td></tr> | ||
<tr><td>1.1</td><td>09/05/2011</td><td>Draft</td><td>Added new Network diagram</td><td>PJH</td></tr> | |||
<tr><td>1.1</td><td>09/05/2011</td><td>Draft</td><td>Issued after review</td><td>ANW</td></tr> | |||
</table> | |||
Latest revision as of 15:35, 31 August 2012
Appendix A: Document History
A.1 References
Ref No | Document Title & ID | Version | Date |
1 | |||
2 | |||
3 |
A.2 Glossary
Term or Acronym | Meaning |
WCS | Warehouse Control System. The OBS RF system Calidus 3pl-Mobile. |
WMS | Warehouse Management System. The OBS WMS is Calidus 3pl |
RDT | Radio Data Terminal. The RF hand held terminals. |
RF | Radio Frequency. |
A.3 Document History
Version | Date | Status | Reason | Initials |
0.1 | 09/05/2011 | Draft | Initial draft | ANW |
1.0 | 09/05/2011 | Issue | Issued | ANW |
1.1 | 09/05/2011 | Draft | Added new Network diagram | PJH |
1.1 | 09/05/2011 | Draft | Issued after review | ANW |
A.4 Authorised By
Phil Harding | OBS Project Manager | _____________________________ |
Tony Walker | OBS Consultant | _____________________________ |