Vision Coding and Release Appendix: Difference between revisions

From Vision
(Created page with '<h2>References</h2> <table width="100%" border="1"> <tr><td>Ref No</td><td>Document Title & ID</td><td>Version</td><td>Date</td></tr> <tr><td>1</td><td></td><td></td><td></td></t...')
 
No edit summary
Line 19: Line 19:
<table width="100%" border="1">
<table width="100%" border="1">
<tr><td>Version</td><td>Date</td><td>Status</td><td>Reason</td><td>Initials</td></tr>
<tr><td>Version</td><td>Date</td><td>Status</td><td>Reason</td><td>Initials</td></tr>
<tr><td>0.1</td><td>04/05/2010</td><td>Draft</td><td>Initial draft</td><td>ANW</td></tr>
<tr><td>0.1</td><td>06/05/2011</td><td>Draft</td><td>Initial draft</td><td>ANW</td></tr>
<tr><td>0.2</td><td>11/05/2010</td><td>Draft</td><td>Initial text complete – spell checking and test plan creation in progress</td><td>ANW</td></tr>
<tr><td>1.0</td><td>13/05/2010</td><td>Issue</td><td>Initial Issue</td><td>ANW</td></tr>
<tr><td>1.0</td><td>13/05/2010</td><td>Issue</td><td>Issued to client</td><td>ANW</td></tr>
</table>
</table>
Line 31: Line 30:
<table width="100%" border="0">
<table width="100%" border="0">
<tr><td><br />Phil Harding</td><td><br />OBS Project Manager</td><td>_____________________________</td></tr>
<tr><td><br />Phil Harding</td><td><br />OBS Project Manager</td><td>_____________________________</td></tr>
<tr><td><br />Jim Batey</td><td><br />Client Representative</td><td>_____________________________</td></tr>
<tr><td><br />Tony Walker</td><td><br />OBS Consultant</td><td>_____________________________</td></tr>
</table>
</table>
[[Category:Vision Coding and Release Doc|999]]
[[Category:Vision Coding and Release Doc|999]]

Revision as of 14:21, 9 May 2011

References

Ref NoDocument Title & IDVersionDate
1
2
3

Glossary

Term or AcronymMeaning
WCSWarehouse Control System. The OBS RF system Calidus 3pl-Mobile.
WMSWarehouse Management System. The OBS WMS is Calidus 3pl
RDTRadio Data Terminal. The RF hand held terminals.
RFRadio Frequency.

Document History

VersionDateStatusReasonInitials
0.106/05/2011DraftInitial draftANW
1.013/05/2010IssueInitial IssueANW


Authorised By



Phil Harding

OBS Project Manager
_____________________________

Tony Walker

OBS Consultant
_____________________________