Vision Coding and Release Appendix: Difference between revisions
From Vision
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
<h1>Appendix A: Document History</h1> | |||
<h2>References</h2> | <h2>References</h2> | ||
<table width="100%" border="1"> | <table width="100%" border="1"> |
Revision as of 15:10, 9 May 2011
Appendix A: Document History
References
Ref No | Document Title & ID | Version | Date |
1 | |||
2 | |||
3 |
Glossary
Term or Acronym | Meaning |
WCS | Warehouse Control System. The OBS RF system Calidus 3pl-Mobile. |
WMS | Warehouse Management System. The OBS WMS is Calidus 3pl |
RDT | Radio Data Terminal. The RF hand held terminals. |
RF | Radio Frequency. |
Document History
Version | Date | Status | Reason | Initials |
0.1 | 06/05/2011 | Draft | Initial draft | ANW |
1.0 | 13/05/2010 | Issue | Initial Issue | ANW |
Authorised By
Phil Harding | OBS Project Manager | _____________________________ |
Tony Walker | OBS Consultant | _____________________________ |