Vision User Guide Appendix: Difference between revisions

From Vision
(Updated based on version 2.4.5)
m (Minor formatting correction)
 
Line 37: Line 37:
<tr><td><br />Tony Walker</td><td><br />OBS Consultant</td><td>_____________________________</td></tr>
<tr><td><br />Tony Walker</td><td><br />OBS Consultant</td><td>_____________________________</td></tr>
</table>
</table>
<approval>
pjh; OBS Project Manager
anw; OBS Consultant
; Client Representative
</approval>


[[Category:Vision User Guide Doc|999]]
[[Category:Vision User Guide Doc|999]]

Latest revision as of 15:28, 23 July 2018

Appendix A: Document History

A.1 References

Ref NoDocument Title & IDVersionDate
1   
2   
3   


A.2 Glossary

Term or AcronymMeaning
WCSWarehouse Control System. The OBS RF system Calidus 3pl-Mobile.
WMSWarehouse Management System. The OBS WMS is Calidus 3pl
RDTRadio Data Terminal. The RF hand held terminals.
RFRadio Frequency.


A.3 Document History


A.4 Authorised By

VersionDateStatusReasonInitials
0.109/05/2011DraftInitial draftANW
1.009/05/2011IssueIssuedANW
2.416/03/2018IssueIssued based on system version 2.4ANW
2.4.114/05/2018IssueIssued based on system version 2.4.1ANW
2.4.216/05/2018IssueIssued based on system version 2.4.2ANW
2.4.324/05/2018IssueIssued based on system version 2.4.3ANW
2.4.418/06/2018IssueIssued based on system version 2.4.4ANW
2.4.523/07/2018IssueIssued based on system version 2.4.5ANW

Phil Harding

OBS Product Manager
_____________________________

Tony Walker

OBS Consultant
_____________________________