WHS0547: Difference between revisions

From WMS
(Split into separate pages)
 
m (Minor formatting change)
 
Line 3: Line 3:
!Field Name||Description||Options
!Field Name||Description||Options
|-
|-
|Stock Take Cycle No/To||The range of stock take cycle numbers to be cleared down||Must be a valid cycle – LOV available – note,  the status of each cycle will be displayed
|''Stock Take Cycle No/To''||The range of stock take cycle numbers to be cleared down||Must be a valid cycle – LOV available – note,  the status of each cycle will be displayed
|-
|-
|Run Date||Date that the update is run.||Must be a valid date – will default to today
|''Run Date''||Date that the update is run.||Must be a valid date – will default to today
|-
|-
|Time||Time that the update is run.||Must be a valid time HH:MM
|''Time''||Time that the update is run.||Must be a valid time HH:MM
|-
|-
!Buttons||Description
! colspan="3" |Buttons
|-
|-
|'''Cleardown'''||Initiates the stock take Cleardown.
|'''Cleardown'''|| colspan="2" |Initiates the stock take Cleardown.
|}
|}


{{Note}}The Cleardown can be done on a range of Stock Take Cycles. Entry of the number of the highest cycle that is not at status pending, and all cycles at status rejected, confirmed and cannot complete will be deleted. Any cycles at status pending will be unaffected by the Cleardown.
{{Note}}The Cleardown can be done on a range of Stock Take Cycles. Entry of the number of the highest cycle that is not at status pending, and all cycles at status rejected, confirmed and cannot complete will be deleted. Any cycles at status pending will be unaffected by the Cleardown.

Latest revision as of 10:08, 30 June 2025

The stock take Cleardown is completed after the stock take cycle has been updated.

WHS0547.png
Field Name Description Options
Stock Take Cycle No/To The range of stock take cycle numbers to be cleared down Must be a valid cycle – LOV available – note, the status of each cycle will be displayed
Run Date Date that the update is run. Must be a valid date – will default to today
Time Time that the update is run. Must be a valid time HH:MM
Buttons
Cleardown Initiates the stock take Cleardown.

Note Note: The Cleardown can be done on a range of Stock Take Cycles. Entry of the number of the highest cycle that is not at status pending, and all cycles at status rejected, confirmed and cannot complete will be deleted. Any cycles at status pending will be unaffected by the Cleardown.