Template:REQ SCR Line
From WMS
Note: To be used with Template:REQ_SCR_Header and Template:REQ_SCR_Footer only.
Usage:
{{REQ_SCR_Line |SCR=The SCR number |System=System affected |Area=The area affected |Description=Description of change |Estimate=Cost or Days |Notes=Notes cross-references |Days=Estimate in Days? (Parameter Omitted-Adds £, Y-removes £, N-replaces with NA) }}
Note: Typically, Days for estimate require EST, FS, ST, IMP and DEV. To apply a simple modifier (e.g. 70%) use the following notation in the estimate parameter:
{{#expr: myest*1.7 }}
where myest is the number of days.
{{{SCR}}} | 0.00 |