Template:REQ SCR Line

From WMS

Note Note: To be used with Template:REQ_SCR_Header and Template:REQ_SCR_Footer only.

Usage:

{{REQ_SCR_Line
|SCR=The SCR number
|System=System affected
|Area=The area affected
|Description=Description of change
|Estimate=Cost or Days 
|Notes=Notes cross-references
|Days=Estimate in Days? (Parameter Omitted-Adds £, Y-removes £, N-replaces with NA)
}}

Note Note: Typically, Days for estimate require EST, FS, ST, IMP and DEV. To apply a simple modifier (e.g. 70%) use the following notation in the estimate parameter:

{{#expr: myest*1.7 }}

where myest is the number of days.

{{{SCR}}}        0.00