Template:EstimateCostDetails

From CTLTMS

Usage:

{{EstimateCostDetails
|Client=Client for estimate rates. Required if an estimate section is to be produced.
|Year=Year for estimate rates. Required if an estimate section is to be produced.
|REQ=Requirements Time. Defaults to zero.
|EST=Estimate Time. Defaults to zero.
|FS=Functional Specification Time. Defaults to zero.
|TS=Technical Specification Time. Defaults to zero.
|DEV=Development Time. Defaults to zero.
|ST=Testing Time. Defaults to zero.
|IMP=Implementation Time. Defaults to zero.
|FSEST=Y if this estimate is for production in a functional specification. Omit if no separate estimate and functional specification sections are required. If the values in the estimate differ from the functional specification, use the fields EREQ, EEST, EFS, ETS, EDEV, ESTT, EIMP to identify the Estimate values. If these are omitted, the Functional Specification values in fields REQ, EST, FS, TS, DEV, ST, IMP will be used.
|EREQ=Estimate Requirements Time. Defaults to the value specified in REQ if omitted.
|EEST=Estimate Estimate Time. Defaults to the value specified in EST if omitted.
|EFS=Estimate Functional Specification Time. Defaults to the value specified in FS if omitted.
|ETS=Estimate Technical Specification Time. Defaults to the value specified in TS if omitted.
|EDEV=Estimate Development Time. Defaults to the value specified in DEV if omitted.
|ESTT=Estimate Testing Time. Defaults to the value specified in ST if omitted.
|EIMP=Estimate Implementation Time. Defaults to the value specified in IMP if omitted.
}} </nowiki>


Note Note: If on a separate page Ensure that you include the relevant Category tag at the bottom of the page.

Note Note: Costs should be numeric. If one is not included, it will default to zero (0).

Note Note: This page should be kept up-to-date with the latest cost changes for all clients, otherwise the costs will default to zero (0)




Warning Warning: Unknown costs for client/year (No client/No year)
Cost Details
Activity No. of Days Rate per Day (£) Cost (£ Exc. VAT)
Requirements 0.00 £First argument to "number_format" must be a number.
Change Request Evaluation 0.00 £First argument to "number_format" must be a number.
Functional Specification 0.00 £First argument to "number_format" must be a number.
Technical Specification 0.00 £First argument to "number_format" must be a number.
Development 0.00 £First argument to "number_format" must be a number.
Testing and Release 0.00 £First argument to "number_format" must be a number.
Implementation 0.00 £First argument to "number_format" must be a number.
 
TOTAL 0.00   £First argument to "number_format" must be a number.
Estimate excludes training, release to live and go live support.