CTMS 11.0 ER020-102

From Calidus HUB


Aptean Logo.png


EMERGENCY RELEASE - CTMS 11.0


RELNOTE ER020-102


Module Program Name Ver Call/Iss Client Ref Pr'ty Remarks Reporter
DATA_ADM_LOG_PROG_NAME_336639.sql Data Script 1.1 336639 SCR-336807-2 3 A new EDI process will need to be setup as follows:

Process Name: BNLMLS_PLAN_OUT

Filename Format: Planresultaat

Customer: As Customer (see FS)

Cost Centre Code: As Cost Centre (see FS)

Location: As Depot (see FS)

Direction: Outbound

Flow Type: PROCESS

Frequency Type: Interval

Interval Length: 2 Minutes

Delivery Folder: /webint/{DATABASE}/interface/ORDXML/{CUST}/OUT

Archive Folder: /webint/{DATABASE}/interface/ORDXML/{CUST}/OUT/archive

Failures Folder: /webint/{DATABASE}/interface/ORDXML/{CUST}/OUT/failures

Triggers:

STATUS: ACCEPTED

STATUS: TENDERED

Parameters:

DELIMITER: PIPE

ORDER_SOURCE_SYSTEM: As Source System (see FS)

Report Values:

Title: Package Name

Name: PROCESS

Value: DP_BNL_EDI_OUT.P_PROCESS_PLAN

Title: Process Name

Name: pi_proc_name

Value: BNLMLS_PLAN_OUT

The following directory structure will need to be setup:

/webint/{DATABASE}/interface/ORDXML/{CUST}/OUT

/webint/{DATABASE}/interface/ORDXML/{CUST}/OUT/archive

/webint/{DATABASE}/interface/ORDXML/{CUST}/OUT/failures

The OBS FTP Server will need to be setup to transfer the 'Plan' files from CTMS.

The external systems will need to be setup to receive the 'Plan' files from the OBS FTP Server.

Dave Meir
TRG_SCH_TRIP_XML_GEN.sql Trigger 5.10 " " " " "
DP_BNL_EDI_OUT.sql Outbound EDI package 1.2 " " " " "


Warning Warning: An EDI change is required with this release.