EST 354331 MARS Add Amended and Status to OnBase PDF files

From Calidus HUB
Aptean Logo.png
STATEMENT OF WORK
CHANGE REQUEST ESTIMATE
ClientMARSProjectDEVSiteMPMS
Client Reference Aptean Reference354331Estimate Version1.0
Prepared ByA N WalkerEstimate Date23/11/18
Invoice Reference Priority3
Customer System Version4.X


Client Request
Following discussion of email of POD documentation, Marshalls cannot open their mail server to trusted relay. To work around this Marshalls propose to send the POD via email from the DMZ the OnBase Pdfs are placed. Marshalls need to differentiate between clean and amended orders to make a decision whether to send the email automatically. After discussion it was suggested that this should be facilitated by highlighting the Status and Amendment flags within the document name.


Aptean Solution
The CALIDUS ePOD Export file naming process will be amended to allow the specification of 2 additional fields in the filename:
  • EPL_STATUS - whether a job was completed successfully ("C") or cancelled ("X").
  • EPL_AMENDED_FLAG - whether a job at completed status (above) has any amendments on it ("Y") or not ("N").

Note Note: In the current configuration, any jobs that have user notes are considered to be amended.


The current configuration for the customer is as follows in EPOD (although it is noted that this is disabled for MLP):

  • POD_(EPL_JOB_CODE)_(DATE)_(TIME)_(UID)
  • MLP_POD_(EPL_JOB_CODE)_(DATE)_(TIME)_(UID)

With these new changes, it is expected that this would be changed as follows:

  • POD_(EPL_JOB_CODE)_(DATE)_(TIME)_(EPL_STATUS)(EPL_AMENDED_FLAG)_(UID)
  • MLP_POD_(EPL_JOB_CODE)_(DATE)_(TIME)_(EPL_STATUS)(EPL_AMENDED_FLAG)_(UID)


Examples of POD files exported under this naming convention:

For the following details:

  • Job Code: 123456
  • Date: 23/11/2018
  • Time: 1:54:26PM

Where images files are exported separately for each job, the following files would be generated:

Complete (no amendments):

  • POD_123456_20181123_135426_CN_1.pdf
  • POD_123456_20181123_135426_CN_1_images.pdf
  • MLP_POD_123456_20181123_135426_CN_1.pdf
  • MLP_POD_123456_20181123_135426_CN_1_images.pdf

Complete (amended):

  • POD_123456_20181123_135426_CY_1.pdf
  • POD_123456_20181123_135426_CY_1_images.pdf
  • MLP_POD_123456_20181123_135426_CY_1.pdf
  • MLP_POD_123456_20181123_135426_CY_1_images.pdf

Cancelled:

  • POD_123456_20181123_135426_XN_1.pdf
  • POD_123456_20181123_135426_XN_1_images.pdf
  • MLP_POD_123456_20181123_135426_XN_1.pdf
  • MLP_POD_123456_20181123_135426_XN_1_images.pdf
The receiving software may the categorise those considered to be 100% successful (with the new flags set to "CN" in the filename) from those that were not completed 100% or were cancelled (any other combinations of these 2 flags in the filename).


Warning Warning: Unknown costs for client/year (MARS/2018)
Cost Details
Activity Hours Rate per hour (£) Cost (£ Exc. VAT)
Requirements 0.00 0.00 £0.00
Change Request Evaluation 0.25 0.00 £0.00
Functional Specification 0.25 0.00 £0.00
Technical Specification 0.00 0.00 £0.00
Development 0.25 0.00 £0.00
Testing and Release 0.25 0.00 £0.00
Implementation 0.25 0.00 £0.00
Project Management 0.25 0.00 £0.00
 
TOTAL 1.50   £0.00
Estimate excludes training, release to live and go live support.


Copyright © Aptean 2018.
This estimate has an expiry date of 30 days from the specified Estimate Date.
The information contained herein is supplied without liability for errors or omissions.