Rules: Difference between revisions
From Vision
(Added all current system rule values to this help screen.) |
No edit summary |
||
Line 40: | Line 40: | ||
** ''WMS Order Status Date'' The name of the field in WMS used to determine the date of the order in the Vision Order Status screen. | ** ''WMS Order Status Date'' The name of the field in WMS used to determine the date of the order in the Vision Order Status screen. | ||
[[Category:Vision User Guide]] | [[Category:Vision User Guide]] | ||
[[Category:Vision User Guide Doc|865]] |
Revision as of 16:27, 9 May 2011
This screen allows users to amend the system rules.
Warning: modifying the values of these rules affects the running of the system and, as such, could result in unpredictable productivity rates or a non-running system.
- Clicking on a title will display the rules associated to that title.
- Rules can be held against any title level.
- Rules are displayed on the right-hand side of the screen.
- Depending on the setup and validation criteria set against the rule, the screen will display an appropriate entry box and allow the user to change the value.
- Once changed, click Save to save the changes.
Rules currently available for modification are:
System Settings
- Measurement Method The mechanism by which Vision calculates the length of a task.
- Export Type Choose the format of exports from Analysis Enquiry screens.
- Format Time Format time in screens as a time. If disabled, this leaves the time as seconds only.
- Productivity Format Format of the Productivity figure - either Tasks per hour or Total Task Qty per hour
- Cleardown Settings
- Clear Daily Details The period to keep for the calculated daily task productivity figures (in days).
- Clear Weekly Details The period to keep for the calculated weekly task productivity figures (in weeks).
- Clear Monthly Details The period to keep for the calculated monthly task productivity figures (in months).
- Clear Quarterly Details The period to keep for the calculated quarterly task productivity figures (in quarters).
- WCS Data
- Clear Mined WCS Activity Records The period to keep for the mined WCS Activity Records (in days).
- WMS Data
- Clear Mined WMS Audit Records The period to keep for the mined WMS Audit records (in days).
- Vision Data
- Clear Vision Event Log The period to keep for the Vision logging of interface events (in days).
- RAG Settings
- Error Background Colour The colour used by Vision to display errors, or productivity levels less than the minimum level.
- Error Foreground colour The colour used by Vision to display errors, or productivity levels less than the minimum level.
- Warning Background Colour The colour used by Vision to display warnings, or productivity levels within the target and minimum levels.
- Warning Foreground Colour The colour used by Vision to display warnings, or productivity levels within the target and minimum levels.
- Info Background Colour The colour used by Vision to display informational messages, or productivity levels greater than the target
- Info Foreground Colour The colour used by Vision to display informational messages, or productivity levels greater than the target
- Order Status Settings
- # Order Days Forward The number of days ahead of today's date to retrieve Order Status information.
- # Order Days Back The number of days before today's date to retrieve Order Status information.
- WMS Order Status Date The name of the field in WMS used to determine the date of the order in the Vision Order Status screen.