OMS1520 Pick and Load Planning Schedule Report

From WMS

This is the Pick and Load Planning Schedule Report screen (OMS1520).

OMS1520.png

The following fields document the report parameters:

Field Name Description
Warehouse The unique code and name of the warehouse to be included in the report.
Load Date The specific calendar date for which the loading schedule is required.

Action Buttons:

  • Report: Executes the generation of the Pick and Load Planning Schedule Report.