Loads: Difference between revisions

From EPOD
(Added Grid navigation information)
(440290 SCR-440290-4 Job Assignment Additional Search Criteria)
 
(19 intermediate revisions by the same user not shown)
Line 1: Line 1:
This screen provides details of the Loads for your site.  
This screen provides details of the loads for your site.  


On entry to the Load Maintenance screen you will be shown a filter, to find your loads.
{{Note}} Your system administrator can modify the text of the labels on this screen. For simplicity, the default labels are shown here.  


[[File:EPOD-Load1.PNG|600px|border]]
 
When you enter the Load Maintenance screen, you will be shown a filter, to find your loads.
 
[[File:EPOD-Load1.PNG|900px|border]]


You can filter through:
You can filter through:
* Load ID
* ''Load ID''.
* Start Date (Planned and Actual)
* ''Vehicle ID''.
* Vehicle ID
* ''User ID''.
* User ID
* ''Load Status'' - a drop-down list of the possible load statuses (''Pending, Assigned, In Progress, Complete, Cancelled'').
* Load Status (Pending, Assigned, In Progress, Complete, Cancelled)
* 2 date filters.
* ''Route Code''.
* ''Load Information''.
 
The date selectors allow you to filter from all the common load dates, namely:
* ''Planned Start''.
* ''Planned End''.
* ''Actual Start''.
* ''Actual End''.
 
You can choose the way that you want to filter the dates, from the following:
* ''Specific'' - on the specific date you enter.
* ''Date Range'' - between the dates that you enter, including those dates.
* ''From'' - from the date you enter forward, including that date.
* ''Up To'' - up to the date you enter, including that date.
 
To help you select a date, the screen will display a calendar pop-up.
 
You can enter two date selections - remember that these are inclusive, so if you select on one planned start date and another planned start date, you won't get anything in the results, because a load can't start on two different dates.
 
 
Once you have entered the criteria, click '''Search'''. The screen will display a table of all the matching data. Any plain text boxes will match data that contains what you enter as the criterion.
 
Alternatively, if you click '''Create Excel Spreadsheet''', the screen will export the load data to a Microsoft Excel spreadsheet. The functionality differs per the browser you have used to access the Admin system, but the likely result is the spreadsheet file will offered for download.
 
 
If you press '''Search''', the screen will display the results in a results data table. A single line will be displayed per load found.
 
You can choose to hide or show almost all of the columns in the results table by using the '''Select Columns''' button on the header. The results table shows the following columns:
* ''Load ID'' - this is always displayed.
* ''Planned Start''.
* ''Actual Start''.
* ''Planned End''.
* ''Actual End''.
* ''Mileage Start''.
* ''Mileage End''.
* ''Trailer''.
* ''Vehicle''.
* ''User''.
* ''Status''.
* ''Route Code''.
* ''Load Information''.
 
You can sort the results table by clicking on the column header - clicking again will reverse the sort sequence.
 
 
Navigation of the table to different pages is controlled by the bottom bar pagination buttons. The top bar allows setting of the number of records displayed on each page.
 
 
The data table will colour the rows based on the status of the load being shown:
* ''Pending'' - no colour.
* ''Assigned'' - Grey.
* ''In Progress'' - Amber.
* ''Complete'' - Green.
* ''Cancelled'' - Red.
 
 
== Actions against an Existing Load ==
You can set the status of a load to ''Cancelled'' by clicking the '''Cancel''' button against that line. {{Warning}} This will cancel all of the jobs under the load as well, so care should be taken with this option. You will be asked to confirm before this happens. If you do choose to proceed, the system will keep an audit log of the cancellation of the load.
 
 
You can select the load and drill through to the [[Jobs|Job Details]] page with the '''Details''' button against each line.
 
If a load has been started, you can view the tracking information by clicking the '''Tracking''' button against the line. This will take you to the [[User Tracking]] screen.


Once you have entered the criteria, click '''Search'''. The screen will display a grid of all the matching data.


Once the filter information is entered at the top of the screen, all matching loads will be displayed in a grid below.  
You can edit, delete and create a new load, if you are a full admin user. {{Note}} You can only edit or delete loads not in progress.


[[File:EPOD-Load2.PNG|600px|border]]
[[File:EPOD-Load2.PNG|600px|border]]
[[File:EPOD-Load3.PNG|600px|border]]
[[File:EPOD-Load3a.PNG|600px|border]]
To edit the load through a pop-up screen, you can click the '''Select''' action against a line, then '''Edit''' and save the changes using the '''Save''' button provided. You can discard any changes you make by clicking '''Close''' or '''Cancel'''.
Within this pop-up, you can assign drivers and vehicles to a load, which can then be transferred to the device. You can do this using the drop-down lists the screen provides for User ID and Vehicle. You can also change the following:
* ''Route Code''.
* ''Trailer ID'' for the load.
* ''Start'' and ''end planned date'' and ''time''.
* ''Distance''.
* ''Load Information''.
If a load has been started, completed or cancelled (status In Progress, Completed or Cancelled respectively), the pop-up might show several additional tabs, to view and edit UDF (User-defined Forms) data, depending on the system configuration:
* ''Start Metrics UDF'' - configurable data entry when the load is started, typically used to record metrics (e.g. Odometer) information.
* ''End Metrics UDF'' - configurable data entry when the load is completed.
If the load isn't complete, you will also be able to do the following from this pop-up:
* You can delete the load using the '''Delete''' button provided.
* You can cancel the load using the '''Cancel''' button provided.
In both cases, you will be asked to confirm that this is what you wanted to do before the screen deletes or cancels the load.


A single line will be displayed per Load found.


You can quickly search this grid with the provided Search entry box - any data in any column partially matching the entry will be displayed immediately as you type.
If you want to assign existing jobs to a load, you can select the ''Job Assignment'' action against a load in the row. The system will display the [[Job Assignment]] screen to let you select the jobs for the load.


Each column can be sorted by clicking on the column header - clicking again will reverse the sort sequence.


Navigation of the grid to different pages is controlled by the bottom bar buttons ('''First''', '''Previous''', '''Number''', '''Next''' and '''Last''').
If you want to sequence the jobs on a load, or link (consolidate) jobs together, you can select the ''Job Sequence'' action against a load in the row. The system will display the [[Job Sequencing]] screen to let you select the jobs for the load.


Depending on the status of the line, the line will be RAG coloured:


* Pending - No colour
== Creating a New Load ==
* Assigned - Grey
You can create a new load by clicking the '''New''' button on the header.
* In Progress - Amber
* Complete - Green
* Cancelled - Red


The users can select the load they require and drill through to the [[Jobs|Job Details]] page with the '''Details''' button against each line.
[[File:EPOD-Load4.PNG|600px|border]]


This page gives users the ability to edit, delete and create a new load, if the user is a full admin user. {{Note}} Only loads not in progress may be deleted or edited.
When you press this button, the screen will show the pop-up and allow you to enter the following fields:


The user can edit the Load through a pop-up screen by clicking '''Select''' then '''Edit''' and save the changes using the '''Save''' button provided. Changes can be discarded by clicking '''Cancel'''.
* ''Status'', selected from a list.
Within this pop-up, users can be assigned to a load which can then be transferred to the device. This can be accomplished by changing the User ID against the Load in the grid.
* ''Assigned To'', selected from a list.
* ''Vehicle'', selected from a list.
* ''Route Code''.
* ''Trailer ID''.
* ''Planned'' load ''Start'' date and time, which can be configured to default to a number of days in the future.
* ''Planned'' load ''End'' date and time, which can be configured to default to a number of days in the future.
* ''Distance planned''.
* ''Load Information''.


A '''Delete''' button is provided on this screen to delete the Load.
The load status defaults to "Pending" and the site defaults to your logged-in site.


A '''New''' button is provided on the header to allow you to enter new loads. When this is pressed, the screen will allow you to enter the following fields:
{{Note}} If the site you are using is configured as a warehouse site, you may also be able to create a linked load for any defined linked transport site. In that case, the screen will also prompt for:
* Assigned User, selected from a list.
* ''Linked Load'', where you can select an existing transport load or create a new one.
* Planned load start date and time
* ''Planned Start/End'', the planned start and end of the transport load.
* Planned Load end date and time
* ''Transport Vehicle'', where you can select a transport vehicle for the transport load.
* Distance planned
* ''Transport User'', where you can select a transport vehicle for the transport load.


The Load Status will default to "Pending" and the Site will default to your logged-in site.
When you save the new load using the '''Save''' button, the Load ID will be generated automatically. Alternatively, you can discard your new load changes with the '''Discard''' or '''Close''' buttons.


A '''Save''' button is provided to save the data - the Load ID will be generated automatically. You can discard your changes with the '''Cancel''' button.
The system can be configured to immediately take you to the Job Assignment screen when the load is saved.


[[Category:UG 291094 EPOD Admin User Guide|200_100]]
[[Category:UG 291094 EPOD Admin User Guide|200_100]]

Latest revision as of 12:57, 26 September 2022

This screen provides details of the loads for your site.

Note Note: Your system administrator can modify the text of the labels on this screen. For simplicity, the default labels are shown here.


When you enter the Load Maintenance screen, you will be shown a filter, to find your loads.

EPOD-Load1.PNG

You can filter through:

  • Load ID.
  • Vehicle ID.
  • User ID.
  • Load Status - a drop-down list of the possible load statuses (Pending, Assigned, In Progress, Complete, Cancelled).
  • 2 date filters.
  • Route Code.
  • Load Information.

The date selectors allow you to filter from all the common load dates, namely:

  • Planned Start.
  • Planned End.
  • Actual Start.
  • Actual End.

You can choose the way that you want to filter the dates, from the following:

  • Specific - on the specific date you enter.
  • Date Range - between the dates that you enter, including those dates.
  • From - from the date you enter forward, including that date.
  • Up To - up to the date you enter, including that date.

To help you select a date, the screen will display a calendar pop-up.

You can enter two date selections - remember that these are inclusive, so if you select on one planned start date and another planned start date, you won't get anything in the results, because a load can't start on two different dates.


Once you have entered the criteria, click Search. The screen will display a table of all the matching data. Any plain text boxes will match data that contains what you enter as the criterion.

Alternatively, if you click Create Excel Spreadsheet, the screen will export the load data to a Microsoft Excel spreadsheet. The functionality differs per the browser you have used to access the Admin system, but the likely result is the spreadsheet file will offered for download.


If you press Search, the screen will display the results in a results data table. A single line will be displayed per load found.

You can choose to hide or show almost all of the columns in the results table by using the Select Columns button on the header. The results table shows the following columns:

  • Load ID - this is always displayed.
  • Planned Start.
  • Actual Start.
  • Planned End.
  • Actual End.
  • Mileage Start.
  • Mileage End.
  • Trailer.
  • Vehicle.
  • User.
  • Status.
  • Route Code.
  • Load Information.

You can sort the results table by clicking on the column header - clicking again will reverse the sort sequence.


Navigation of the table to different pages is controlled by the bottom bar pagination buttons. The top bar allows setting of the number of records displayed on each page.


The data table will colour the rows based on the status of the load being shown:

  • Pending - no colour.
  • Assigned - Grey.
  • In Progress - Amber.
  • Complete - Green.
  • Cancelled - Red.


Actions against an Existing Load

You can set the status of a load to Cancelled by clicking the Cancel button against that line. Warning Warning: This will cancel all of the jobs under the load as well, so care should be taken with this option. You will be asked to confirm before this happens. If you do choose to proceed, the system will keep an audit log of the cancellation of the load.


You can select the load and drill through to the Job Details page with the Details button against each line.

If a load has been started, you can view the tracking information by clicking the Tracking button against the line. This will take you to the User Tracking screen.


You can edit, delete and create a new load, if you are a full admin user. Note Note: You can only edit or delete loads not in progress.

EPOD-Load2.PNG EPOD-Load3.PNG EPOD-Load3a.PNG

To edit the load through a pop-up screen, you can click the Select action against a line, then Edit and save the changes using the Save button provided. You can discard any changes you make by clicking Close or Cancel.

Within this pop-up, you can assign drivers and vehicles to a load, which can then be transferred to the device. You can do this using the drop-down lists the screen provides for User ID and Vehicle. You can also change the following:

  • Route Code.
  • Trailer ID for the load.
  • Start and end planned date and time.
  • Distance.
  • Load Information.


If a load has been started, completed or cancelled (status In Progress, Completed or Cancelled respectively), the pop-up might show several additional tabs, to view and edit UDF (User-defined Forms) data, depending on the system configuration:

  • Start Metrics UDF - configurable data entry when the load is started, typically used to record metrics (e.g. Odometer) information.
  • End Metrics UDF - configurable data entry when the load is completed.


If the load isn't complete, you will also be able to do the following from this pop-up:

  • You can delete the load using the Delete button provided.
  • You can cancel the load using the Cancel button provided.

In both cases, you will be asked to confirm that this is what you wanted to do before the screen deletes or cancels the load.


If you want to assign existing jobs to a load, you can select the Job Assignment action against a load in the row. The system will display the Job Assignment screen to let you select the jobs for the load.


If you want to sequence the jobs on a load, or link (consolidate) jobs together, you can select the Job Sequence action against a load in the row. The system will display the Job Sequencing screen to let you select the jobs for the load.


Creating a New Load

You can create a new load by clicking the New button on the header.

EPOD-Load4.PNG

When you press this button, the screen will show the pop-up and allow you to enter the following fields:

  • Status, selected from a list.
  • Assigned To, selected from a list.
  • Vehicle, selected from a list.
  • Route Code.
  • Trailer ID.
  • Planned load Start date and time, which can be configured to default to a number of days in the future.
  • Planned load End date and time, which can be configured to default to a number of days in the future.
  • Distance planned.
  • Load Information.

The load status defaults to "Pending" and the site defaults to your logged-in site.

Note Note: If the site you are using is configured as a warehouse site, you may also be able to create a linked load for any defined linked transport site. In that case, the screen will also prompt for:

  • Linked Load, where you can select an existing transport load or create a new one.
  • Planned Start/End, the planned start and end of the transport load.
  • Transport Vehicle, where you can select a transport vehicle for the transport load.
  • Transport User, where you can select a transport vehicle for the transport load.

When you save the new load using the Save button, the Load ID will be generated automatically. Alternatively, you can discard your new load changes with the Discard or Close buttons.

The system can be configured to immediately take you to the Job Assignment screen when the load is saved.